Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
182
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0261 # 06 Y:2024 | 06 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $400 | $5,940 | n/a |
UU0261 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,063 | $9,140 | n/a |
UU0261 # 03 Y:2024 | 03 | 2024 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $12,100 | $21,600 | n/a |
UU0261 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,592 | $37,200 | n/a |
UU0261 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $22,296 | $572,100 | n/a |
UU0261 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,386 | $8,280 | n/a |
UU0194 # 01 Y:2022 | 01 | 2022 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $39,902 | $83,130 | Not Implemented |
UU0194 # 06 Y:2022 | 06 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $896 | $1,796 | Implemented |
UU0194 # 05 Y:2022 | 05 | 2022 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $1,788 | $2,208 | Not Implemented |
UU0194 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,610 | $23,208 | Implemented |
UU0194 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,721 | $113,682 | Implemented |
UU0194 # 03 Y:2022 | 03 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $25,369 | $20,108 | Not Implemented |
UU0192 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,872 | $40,613 | Implemented |
UU0192 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $52,219 | $52,219 | Implemented |
UU0192 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,064 | $4,892 | Implemented |
UU0192 # 06 Y:2022 | 06 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,269 | $1,000 | Not Implemented |
UU0192 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,994 | $15,475 | Implemented |
UU0192 # 08 Y:2022 | 08 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $464 | $100 | Not Implemented |
UU0192 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $2,978 | $3,520 | Implemented |
UU0192 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $3,945 | $5,606 | Implemented |
UU0186 # 02 Y:2021 | 02 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,932 | $15,000 | Not Implemented |
UU0186 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,919 | $19,705 | Implemented |
UU0186 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $822 | $1,645 | Implemented |
UU0186 # 06 Y:2021 | 06 | 2021 | ADD AREA LIGHTING SWITCHES | $398 | $883 | Implemented |
UU0186 # 05 Y:2021 | 05 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $544 | $200 | Implemented |