Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
352
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0653 # 07 Y:1998 | 07 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $370,000 | $100,000 | Implemented |
GT0653 # 06 Y:1998 | 06 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $8,980 | $31,660 | Implemented |
GT0653 # 05 Y:1998 | 05 | 1998 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $865 | $0 | Not Implemented |
GT0653 # 04 Y:1998 | 04 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $384 | $0 | Implemented |
GT0653 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $647 | $420 | Not Implemented |
GT0653 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,810 | $600 | Implemented |
GT0653 # 01 Y:1998 | 01 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,720 | $2,000 | Not Implemented |
TN0645 # 04 Y:1998 | 04 | 1998 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $221,455 | $70,000 | Not Implemented |
TN0645 # 06 Y:1998 | 06 | 1998 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $51,945 | $200,000 | Not Implemented |
TN0645 # 08 Y:1998 | 08 | 1998 | TREAT AND REUSE RINSE WATERS | $28,105 | $69,200 | Not Implemented |
TN0645 # 10 Y:1998 | 10 | 1998 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $9,390 | $8,000 | Implemented |
TN0645 # 13 Y:1998 | 13 | 1998 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,780 | $14,300 | Not Implemented |
TN0645 # 11 Y:1998 | 11 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,880 | $5,000 | Implemented |
TN0645 # 07 Y:1998 | 07 | 1998 | USE DEIONIZED WATER IN UPSTREAM RINSE TANKS | $48,650 | $120,000 | Not Implemented |
TN0645 # 05 Y:1998 | 05 | 1998 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $198,225 | $250,000 | Not Implemented |
TN0645 # 12 Y:1998 | 12 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,310 | $1,120 | Not Implemented |
TN0645 # 09 Y:1998 | 09 | 1998 | INSTALL SET-BACK TIMERS | $15,755 | $1,555 | Not Implemented |
TN0645 # 03 Y:1998 | 03 | 1998 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $237,600 | $153,485 | Not Implemented |
TN0645 # 01 Y:1998 | 01 | 1998 | ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT | $408,630 | $24,685 | Implemented |
TN0645 # 02 Y:1998 | 02 | 1998 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $277,345 | $644,800 | Not Implemented |
BD0123 # 08 Y:1998 | 08 | 1998 | MINIMIZE WATER USAGE | $259 | $620 | Not Implemented |
BD0123 # 09 Y:1998 | 09 | 1998 | PAY BILLS ON TIME TO AVOID LATE FEES | $533 | $0 | Implemented |
BD0123 # 07 Y:1998 | 07 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $44,117 | $14,500 | Not Implemented |
BD0123 # 06 Y:1998 | 06 | 1998 | USE SYNTHETIC LUBRICANT | $555 | $300 | Not Implemented |
BD0123 # 03 Y:1998 | 03 | 1998 | UPGRADE CONTROLS ON COMPRESSORS | $1,788 | $1,500 | Not Implemented |