IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

218

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0131 # 12 Y:2007 12 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,231 $1 Not Implemented
IC0131 # 13 Y:2007 13 2007 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,393 $1 Not Implemented
IC0131 # 14 Y:2007 14 2007 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $956 $7,500 Not Implemented
IC0131 # 15 Y:2007 15 2007 MINIMIZE WATER USAGE $7,267 $15,000 Implemented
IC0131 # 16 Y:2007 16 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $32 $1 Implemented
IC0131 # 17 Y:2007 17 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,723 $15,000 Implemented
IC0131 # 18 Y:2007 18 2007 $19,189 $38,378 Implemented
UW0003 # 01 Y:2007 01 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,385 $50,000 Not Implemented
UW0003 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $929 $2,100 Implemented
UW0003 # 03 Y:2007 03 2007 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,723 $20,750 Not Implemented
UW0003 # 04 Y:2007 04 2007 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,551 $7,020 Implemented
UW0003 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $905 $1,200 Implemented
IC0129 # 01 Y:2007 01 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $14,537 $81,554 Implemented
IC0129 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,611 $1,035 Implemented
IC0129 # 03 Y:2007 03 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,183 $4,040 Not Implemented
IC0129 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,613 $22,008 Implemented
IC0129 # 05 Y:2007 05 2007 UPGRADE CONTROLS ON COMPRESSORS $561 $0 Implemented
IC0129 # 06 Y:2007 06 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,946 $2,902 Implemented
IC0129 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $506 $1,782 Implemented
IC0129 # 08 Y:2007 08 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,264 $0 Implemented
MI0154 # 01 Y:2007 01 2007 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $99,787 $131,000 Not Implemented
MI0154 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,215 $73,710 Implemented
MI0154 # 03 Y:2007 03 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $30,511 $120 Implemented
MI0154 # 04 Y:2007 04 2007 DISCONNECT BALLASTS $27,192 $1,450 Not Implemented
MI0154 # 05 Y:2007 05 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,388 $1,250 Not Implemented