IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

334

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0139 # 03 Y:2014 03 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,460 $500 Implemented
TT0139 # 04 Y:2014 04 2014 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $76,287 $2,900 Not Implemented
NC0517 # 01 Y:2014 01 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $18,930 $1,250 Implemented
NC0517 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $74,398 $162,227 Implemented
NC0517 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,226 $215,258 Implemented
NC0517 # 04 Y:2014 04 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,998 $2,000 Not Implemented
NC0517 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $5,506 $15,200 Not Implemented
NC0517 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $5,090 $12,500 Not Implemented
NC0517 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,941 $5,000 Not Implemented
NC0517 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,395 $100 Implemented
NC0517 # 09 Y:2014 09 2014 INSTALL COMMON HEADER ON COMPRESSORS $9,004 $8,600 Not Implemented
NC0517 # 10 Y:2014 10 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,346 $200 Implemented
NC0517 # 11 Y:2014 11 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $10,806 $5,000 Not Implemented
NC0517 # 12 Y:2014 12 2014 DEVELOP A REPAIR/REPLACE POLICY $1,458 $4,256 Not Implemented
NC0517 # 13 Y:2014 13 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $525 $160 Not Implemented
UD0907 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,297 $28,275 Implemented
UD0907 # 02 Y:2014 02 2014 DEVELOP A REPAIR/REPLACE POLICY $269 $0 Not Implemented
UD0907 # 03 Y:2014 03 2014 COVER OPEN TANKS $2,165 $210 Not Implemented
UD0907 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $762 $1,000 Implemented
UD0907 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $518 $0 Implemented
UD0907 # 06 Y:2014 06 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $314 $500 Implemented
UD0907 # 07 Y:2014 07 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,566 $0 Not Implemented
UD0907 # 08 Y:2014 08 2014 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,440 $0 Implemented
MI0264 # 21 Y:2014 21 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $485 $80 Not Implemented
MI0264 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,260 $87,618 Not Implemented