Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,376
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0095 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,327 | $128 | Implemented |
MZ0223 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,108 | $43,540 | Implemented |
MZ0223 # 02 Y:2017 | 02 | 2017 | INSULATE BARE EQUIPMENT | $7,340 | $2,435 | Implemented |
MZ0223 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,416 | $1,428 | Implemented |
MZ0223 # 04 Y:2017 | 04 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,067 | $925 | Implemented |
TT0192 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $175,487 | $344,898 | Implemented |
TT0192 # 02 Y:2017 | 02 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,730 | $18,400 | Implemented |
IP0083 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $25,016 | $5 | Implemented |
IP0083 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,290 | $0 | Implemented |
IP0083 # 04 Y:2017 | 04 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,706 | $0 | Implemented |
IP0083 # 06 Y:2017 | 06 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $15,077 | $1,296 | Implemented |
IP0083 # 07 Y:2017 | 07 | 2017 | INSTALL OCCUPANCY SENSORS | $13,276 | $7,860 | Implemented |
IP0083 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,581 | $23,044 | Implemented |
IP0083 # 09 Y:2017 | 09 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,902 | $3,417 | Implemented |
UA0177 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,201 | $1,265 | Implemented |
UA0177 # 03 Y:2017 | 03 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,275 | $480 | Implemented |
MZ0221 # 01 Y:2017 | 01 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,101 | $1,160 | Implemented |
MZ0221 # 02 Y:2017 | 02 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,200 | $0 | Implemented |
MZ0221 # 03 Y:2017 | 03 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,574 | $100 | Implemented |
MZ0221 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $1,286 | $2,350 | Implemented |
MZ0221 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,974 | $0 | Implemented |
UA0174 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $21,405 | $588 | Implemented |
UA0174 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $221 | $564 | Implemented |
UA0174 # 05 Y:2017 | 05 | 2017 | USE OPTIMUM TEMPERATURE | $33,738 | $8,460 | Implemented |
UA0174 # 06 Y:2017 | 06 | 2017 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $826 | $2,820 | Implemented |