IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0192 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,730 $18,400 Implemented
TT0192 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $175,487 $344,898 Implemented
OK0954 # 05 Y:2016 05 2016 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $6,862 $3,640 Implemented
OK0954 # 02 Y:2016 02 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $84,389 $6,066 Implemented
OK0885 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,111 $1,900 Implemented
OK0885 # 02 Y:2014 02 2014 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $42,502 $2,889 Implemented
OK0885 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $10,088 $12,319 Implemented
AR0188 # 03 Y:2000 03 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $734 $2,130 Implemented
AR0188 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $759 $3,641 Implemented
AR0188 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $369 $0 Implemented
AR0188 # 05 Y:2000 05 2000 INSTALL AN UNINTERUPTABLE POWER SUPPLY $60,000 $3,000 Implemented
AR0149 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $605 $140 Implemented
AR0149 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,237 $360 Implemented
AR0149 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $576 $538 Implemented
AR0149 # 04 Y:1998 04 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,280 $240 Implemented
AR0141 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,369 $100 Implemented
AR0141 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $613 $102 Implemented
AR0074 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,013 $14,650 Implemented
AR0074 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,864 $350 Implemented
AR0074 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,547 $25 Implemented
AR0074 # 07 Y:1995 07 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $408 $0 Implemented
AR0074 # 08 Y:1995 08 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $18,582 $500 Implemented
AR0074 # 09 Y:1995 09 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $2,696 $200 Implemented
AR0074 # 10 Y:1995 10 1995 MAINTAIN MACHINES TO REDUCE LEAKS $3,240 $1,000 Implemented
AR0074 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $800 $584 Implemented