Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,374
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0287 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,506 | $675 | Implemented |
UM0287 # 03 Y:2005 | 03 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,467 | $1,200 | Implemented |
UM0287 # 04 Y:2005 | 04 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,493 | $8,770 | Implemented |
UM0287 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,726 | $13,103 | Implemented |
UM0287 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $6,622 | $206 | Not Implemented |
UM0287 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,116 | $1,000 | Implemented |
UM0287 # 08 Y:2005 | 08 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,334 | $1,250 | Implemented |
UU0082 # 01 Y:2005 | 01 | 2005 | USE CORRECT SIZE STEAM TRAPS | $32,790 | $20,000 | Not Implemented |
UU0082 # 02 Y:2005 | 02 | 2005 | SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE | $36,280 | $0 | Not Implemented |
UU0082 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $784 | $4,300 | Not Implemented |
UU0082 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $786 | $600 | Not Implemented |
UU0082 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,720 | $540 | Not Implemented |
IA0367 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $443 | $52 | Implemented |
IA0367 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $758 | $200 | Implemented |
IA0367 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $487 | $1,080 | Implemented |
IA0367 # 04 Y:2005 | 04 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $9,149 | $0 | Implemented |
IA0367 # 05 Y:2005 | 05 | 2005 | EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME | $20,800 | $1,046 | Implemented |
IA0367 # 06 Y:2005 | 06 | 2005 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $650 | $1,840 | Implemented |
IA0367 # 07 Y:2005 | 07 | 2005 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $650 | $1,270 | Implemented |
IA0367 # 08 Y:2005 | 08 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $11,267 | $14,500 | Not Implemented |
IA0367 # 09 Y:2005 | 09 | 2005 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $8,580 | $14,000 | Not Implemented |
IA0367 # 10 Y:2005 | 10 | 2005 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,781 | $500 | Not Implemented |
IA0367 # 11 Y:2005 | 11 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,202 | $1,640 | Not Implemented |
IA0367 # 12 Y:2005 | 12 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $7,745 | $28,000 | Not Implemented |
UM0286 # 01 Y:2005 | 01 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $9,539 | $27,000 | Not Implemented |