Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,374
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0180 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $903 | $1,350 | Not Implemented |
SU0174 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,108 | $0 | Implemented |
SU0174 # 02 Y:2004 | 02 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $58,500 | $16,260 | Implemented |
SU0174 # 03 Y:2004 | 03 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $85 | $45 | Implemented |
SU0174 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,102 | $13,384 | Implemented |
SU0174 # 05 Y:2004 | 05 | 2004 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $13,639 | $14,240 | Implemented |
SU0174 # 06 Y:2004 | 06 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,489 | $10,360 | Implemented |
UD0682 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $27,674 | $15,870 | Not Implemented |
UD0682 # 02 Y:2003 | 02 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $27,255 | $5,000 | Not Implemented |
UD0682 # 03 Y:2003 | 03 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $21,300 | $11,000 | Not Implemented |
UD0682 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,809 | $47,488 | Not Implemented |
UD0682 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,790 | $3,000 | Implemented |
UD0682 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,062 | $5,376 | Not Implemented |
UD0682 # 07 Y:2003 | 07 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $4,800 | $2,000 | Implemented |
UD0682 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,025 | $1,000 | Implemented |
UD0682 # 09 Y:2003 | 09 | 2003 | DEVELOP STANDARD OPERATING PROCEDURES | $2,596 | $0 | Implemented |
UD0682 # 10 Y:2003 | 10 | 2003 | DISCONNECT BALLASTS | $1,534 | $116 | Not Implemented |
UD0682 # 11 Y:2003 | 11 | 2003 | INSTALL OCCUPANCY SENSORS | $366 | $428 | Not Implemented |
IA0328 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $107 | $145 | Implemented |
IA0328 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,948 | $254 | Implemented |
IA0328 # 03 Y:2003 | 03 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $327 | $71 | Implemented |
IA0328 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,591 | $17,302 | Implemented |
IA0328 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $636 | $827 | Implemented |
IA0328 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $120 | $333 | Not Implemented |
IA0328 # 07 Y:2003 | 07 | 2003 | INSULATE BARE EQUIPMENT | $446 | $1,365 | Not Implemented |