IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,507

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0228 # 04 Y:2003 04 2003 USE RADIANT HEATER FOR SPOT HEATING $1,666 $3,000 Not Implemented
BD0228 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $959 $0 Not Implemented
BD0228 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $730 $1,500 Not Implemented
BD0228 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $107 $295 Not Implemented
BD0228 # 08 Y:2003 08 2003 USE EVAPORATION TO CONCENTRATE MATERIAL $454 $860 Not Implemented
BD0228 # 09 Y:2003 09 2003 MINIMIZE WATER USAGE $692 $690 Not Implemented
BD0228 # 10 Y:2003 10 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,250 $1,000 Not Implemented
UM0223 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,160 $500 Implemented
UM0223 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,344 $958 Implemented
UM0223 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,704 $5,850 Not Implemented
UM0223 # 04 Y:2003 04 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $23,898 $3,150 Not Implemented
UM0223 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,530 $3,000 Implemented
UM0223 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $37,000 $9,500 Implemented
UM0223 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,160 $1,250 Implemented
OK0651 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,419 $20,491 n/a
OK0651 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,926 $1,360 n/a
OK0651 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,142 $2,300 n/a
OK0651 # 04 Y:2002 04 2002 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $131,274 $26,000 n/a
OK0651 # 05 Y:2002 05 2002 INSTALL SET-BACK TIMERS $10,697 $1,416 n/a
OK0651 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $741 $975 n/a
OK0651 # 07 Y:2002 07 2002 IMPROVE SPACE COMFORT CONDITIONING $37,907 $36,300 n/a
OK0651 # 08 Y:2002 08 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $11,700 $1,350 n/a
OK0651 # 09 Y:2002 09 2002 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $23,400 $80,000 n/a
OK0651 # 10 Y:2002 10 2002 IMPROVE SPACE COMFORT CONDITIONING $46,800 $2,500 n/a
OK0652 # 01 Y:2002 01 2002 INSTALL SET-BACK TIMERS $2,551 $20 Implemented