IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,347

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0527 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $484 $224 Not Implemented
SU0527 # 07 Y:2022 07 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,990 $1,787 Not Implemented
SU0527 # 08 Y:2022 08 2022 INSULATE BARE EQUIPMENT $18,264 $9,030 Not Implemented
SU0527 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,474 $24,111 Not Implemented
SU0527 # 10 Y:2022 10 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $40,423 $248,940 Not Implemented
IC0273 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,366 $2,851 Not Implemented
IC0273 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,794 $4,100 Not Implemented
IC0273 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $879 $841 Not Implemented
IC0273 # 04 Y:2023 04 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $200 $35 Not Implemented
IC0273 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $279,174 $2,543,426 Not Implemented
UL2214 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $67,238 $1,046,392 Not Implemented
UL2214 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $43,721 $432,345 Not Implemented
UL2214 # 03 Y:2022 03 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,475 $0 Not Implemented
UL2214 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $626 $3,993 Not Implemented
UL2214 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,543 $0 Not Implemented
UL2214 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,187 $1,760 Not Implemented
UL2214 # 07 Y:2022 07 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $612 $0 Not Implemented
TT0284 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,705 $50,300 Not Implemented
TT0284 # 02 Y:2023 02 2023 MINIMIZE WATER USAGE $10,675 $240 Implemented
TT0284 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $8,764 $13,000 Implemented
TT0284 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,557 $3,205 Not Implemented
TT0284 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $7,905 $7,500 Not Implemented
TT0284 # 06 Y:2023 06 2023 AIR CONDITION ONLY SPACE NECESSARY $3,153 $6,000 Not Implemented
TT0284 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,804 $10,150 Implemented
TT0284 # 08 Y:2023 08 2023 OPTIMIZE PLANT POWER FACTOR $2,266 $3,750 Not Implemented