IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,507

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0321 # 04 Y:1998 04 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,470 $0 Not Implemented
AM0321 # 05 Y:1998 05 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $920 $170 Implemented
AM0321 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $680 $100 Implemented
AM0321 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $560 $220 Not Implemented
AM0321 # 08 Y:1998 08 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $320 $0 Not Implemented
ME0238 # 01 Y:1998 01 1998 INSTALL REPLACEMENT DOORS $4,297 $8,000 Not Implemented
ME0238 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,607 $17,669 Implemented
ME0238 # 03 Y:1998 03 1998 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,854 $10,432 Not Implemented
ME0238 # 04 Y:1998 04 1998 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,583 $3,576 Not Implemented
ME0238 # 05 Y:1998 05 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $747 $2,209 Implemented
ME0238 # 06 Y:1998 06 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $306 $1,090 Not Implemented
ME0238 # 07 Y:1998 07 1998 PAY UTILITY BILLS ON TIME $176 $0 Implemented
ME0238 # 08 Y:1998 08 1998 PAY UTILITY BILLS ON TIME $87 $0 Implemented
ME0238 # 09 Y:1998 09 1998 BURN WASTE OIL FOR HEAT $2,633 $21,500 Not Implemented
ME0238 # 10 Y:1998 10 1998 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $1,637 $0 Implemented
HO0170 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,110 $35,934 Implemented
HO0170 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $652 $500 Implemented
HO0170 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $920 $20 Implemented
HO0170 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $455 $60 Implemented
HO0170 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,250 $200 Not Implemented
HO0170 # 06 Y:1998 06 1998 USE RADIANT HEATER FOR SPOT HEATING $3,205 $9,600 Implemented
HO0170 # 07 Y:1998 07 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $774 $750 Implemented
HO0170 # 08 Y:1998 08 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $4,800 $5,200 Implemented
HO0170 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $611 $500 Implemented
HO0170 # 10 Y:1998 10 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $15,000 $1,040 Not Implemented