IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

293

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0292 # 11 Y:2020 11 2020 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $147,061 $38,160 Not Implemented
MZ0292 # 13 Y:2020 13 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,837 $450 Implemented
MZ0292 # 12 Y:2020 12 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $99,528 $502,000 Implemented
MZ0292 # 05 Y:2020 05 2020 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $130 $50 Implemented
MZ0292 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $62,704 $59,378 Not Implemented
MZ0292 # 08 Y:2020 08 2020 USE PHOTOCELL CONTROLS $43 $73 Implemented
MZ0292 # 09 Y:2020 09 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,588 $240 Implemented
MZ0292 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,645 $29,820 Implemented
MZ0292 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,098 $5,000 Implemented
MZ0292 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $460 $1,000 Implemented
MZ0292 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,892 $4,700 Not Implemented
MZ0292 # 07 Y:2020 07 2020 RECOVER WASTE HEAT FROM EQUIPMENT $18,874 $22,200 Not Implemented
MZ0285 # 06 Y:2019 06 2019 USE COMPRESSOR AIR FILTERS $1,546 $360 Implemented
MZ0285 # 02 Y:2019 02 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,338 $2,880 Implemented
MZ0285 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,668 $1,820 Implemented
MZ0285 # 05 Y:2019 05 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,415 $7,000 Not Implemented
MZ0285 # 01 Y:2019 01 2019 RECOVER WASTE HEAT FROM EQUIPMENT $4,249 $7,200 Not Implemented
MZ0285 # 03 Y:2019 03 2019 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $66,439 $129,987 Not Implemented
MZ0241 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,151 $4,125 Implemented
MZ0241 # 07 Y:2017 07 2017 INSTALL OCCUPANCY SENSORS $658 $700 Implemented
MZ0241 # 10 Y:2017 10 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $93,474 $93,474 Implemented
MZ0241 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,321 $100,150 Implemented
MZ0241 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,218 $1,820 Implemented
MZ0241 # 08 Y:2017 08 2017 USE SOLAR HEAT TO HEAT WATER $71,196 $875,000 Not Implemented
MZ0241 # 02 Y:2017 02 2017 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,238 $3,570 Implemented