IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0543 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $311 $80 Implemented
NC0543 # 08 Y:2015 08 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $192 $500 Implemented
NC0543 # 07 Y:2015 07 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,398 $21,800 Not Implemented
NC0543 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,805 $100 Implemented
NC0543 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,738 $6,000 Not Implemented
NC0543 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $7,041 $10,000 Not Implemented
NC0543 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,402 $100 Implemented
TT0017 # 03 Y:2008 03 2008 OPTIMIZE PLANT POWER FACTOR $1,370 $5,170 Not Implemented
TT0017 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $302 $324 Not Implemented
TT0017 # 01 Y:2008 01 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,583 $1,715 Not Implemented
TT0017 # 04 Y:2008 04 2008 INSTALL SKYLIGHTS $12,995 $22,450 Not Implemented
TT0017 # 05 Y:2008 05 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,947 $17,385 Not Implemented
TN0667 # 04 Y:1999 04 1999 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $22,500 $25,000 Not Implemented
TN0667 # 01 Y:1999 01 1999 RECOVER AND REUSE WASTE MATERIAL $222,220 $77,760 Not Implemented
TN0667 # 02 Y:1999 02 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $52,782 $80,100 Implemented
TN0667 # 03 Y:1999 03 1999 METER WASTE WATER $26,280 $2,980 Implemented
TN0667 # 05 Y:1999 05 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $20,700 $21,780 Not Implemented
TN0667 # 06 Y:1999 06 1999 OPTIMIZE PLANT POWER FACTOR $15,168 $29,100 Not Implemented
TN0645 # 04 Y:1998 04 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $221,455 $70,000 Not Implemented
TN0645 # 05 Y:1998 05 1998 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $198,225 $250,000 Not Implemented
TN0645 # 06 Y:1998 06 1998 USE A DIFFERENT OR RECYCLED RAW MATERIAL $51,945 $200,000 Not Implemented
TN0645 # 07 Y:1998 07 1998 USE DEIONIZED WATER IN UPSTREAM RINSE TANKS $48,650 $120,000 Not Implemented
TN0645 # 08 Y:1998 08 1998 TREAT AND REUSE RINSE WATERS $28,105 $69,200 Not Implemented
TN0645 # 09 Y:1998 09 1998 INSTALL SET-BACK TIMERS $15,755 $1,555 Not Implemented
TN0645 # 10 Y:1998 10 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $9,390 $8,000 Implemented