IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,374

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0239 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,641 $9,144 Not Implemented
UA0239 # 07 Y:2021 07 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,822 $2,500 Not Implemented
UA0239 # 08 Y:2021 08 2021 USE RADIANT HEATER FOR SPOT HEATING $794 $709 Not Implemented
TT0249 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $87,163 $208,768 Implemented
TT0249 # 02 Y:2021 02 2021 USE SOLAR HEAT FOR HEAT $66,558 $342,530 Not Implemented
TT0249 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $17,343 $140,000 Not Implemented
TT0249 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,133 $1,500 Implemented
TT0249 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,071 $325 Not Implemented
TT0249 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,717 $5,000 Not Implemented
TT0249 # 07 Y:2021 07 2021 MINIMIZE WATER USAGE $846 $1,753 Not Implemented
SU0502 # 01 Y:2021 01 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,573 $66 Not Implemented
SU0502 # 02 Y:2021 02 2021 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,847 $93 Implemented
SU0502 # 03 Y:2021 03 2021 REDUCE VENTILATION AIR $592 $499 Not Implemented
SU0502 # 04 Y:2021 04 2021 ELIMINATE/REDUCE AN OPERATION $1,845 $2,386 Not Implemented
SU0502 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $177 $244 Implemented
SU0502 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $275 $402 Implemented
UA0236 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,459 $3,873 Implemented
UA0236 # 02 Y:2021 02 2021 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,582 $846 Implemented
UA0236 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,957 $4,200 Implemented
UA0236 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,959 $800 Not Implemented
UA0236 # 05 Y:2021 05 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,400 $808 Not Implemented
UU0178 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,811 $1,300 Not Implemented
UU0178 # 02 Y:2021 02 2021 INSULATE BARE EQUIPMENT $8,654 $3,913 Not Implemented
UU0178 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $4,347 $9,400 Not Implemented
UU0178 # 04 Y:2021 04 2021 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $99,244 $320,000 Not Implemented