IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

133

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0226 # 09 Y:2012 09 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,502 $80 Implemented
MI0226 # 10 Y:2012 10 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $922 $80 Implemented
MI0226 # 11 Y:2012 11 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $656 $3,010 Implemented
UF0420 # 01 Y:2009 01 2009 PAY UTILITY BILLS ON TIME $10,674 $0 Not Implemented
UF0420 # 02 Y:2009 02 2009 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $5,219 $2,785 Not Implemented
UF0420 # 03 Y:2009 03 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $30,946 $12,360 Not Implemented
UF0420 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,121 $39,435 Not Implemented
UF0420 # 05 Y:2009 05 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,022 $10,000 Not Implemented
UF0420 # 06 Y:2009 06 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $21,915 $607 Not Implemented
UF0420 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,325 $900 Not Implemented
UF0420 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,248 $0 Not Implemented
UF0420 # 09 Y:2009 09 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,954 $3,000 Not Implemented
UF0420 # 10 Y:2009 10 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $28,013 $0 Not Implemented
UF0420 # 11 Y:2009 11 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,628 $33,595 Not Implemented
UF0420 # 12 Y:2009 12 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,333 $760 Not Implemented
MI0085 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $8,514 $2,300 Implemented
MI0085 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,699 $1,200 Implemented
MI0085 # 03 Y:2004 03 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $868 $0 Not Implemented
MI0085 # 04 Y:2004 04 2004 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $1,834 $130 Implemented
MI0085 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $-19 $2,670 Implemented
MI0085 # 06 Y:2004 06 2004 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $20,000 $0 Not Implemented
MI0085 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $263 $102 Implemented
MI0019 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $20,022 $10,000 n/a
MI0019 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,044 $312 n/a
MI0019 # 03 Y:2001 03 2001 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $8,400 $2,000 n/a