Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
158
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0486 # 06 Y:2019 | 06 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $869 | $845 | Not Implemented |
SU0486 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $802 | $857 | Implemented |
SU0486 # 08 Y:2019 | 08 | 2019 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $411 | $839 | Implemented |
SU0486 # 09 Y:2019 | 09 | 2019 | INSTALL OCCUPANCY SENSORS | $767 | $2,060 | Not Implemented |
UA0215 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $678 | $970 | Implemented |
UA0215 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $816 | $50 | Implemented |
UA0215 # 03 Y:2019 | 03 | 2019 | INSTALL OCCUPANCY SENSORS | $663 | $539 | Not Implemented |
UA0215 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,328 | $11,266 | Not Implemented |
UA0215 # 01 Y:2019 | 01 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,317 | $50 | Implemented |
UU0154 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,288 | $2,040 | Implemented |
UU0154 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $170,761 | $461,313 | Implemented |
UU0154 # 02 Y:2019 | 02 | 2019 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $262,908 | $2,299,950 | Not Implemented |
UU0154 # 01 Y:2019 | 01 | 2019 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $567,696 | $2,355,000 | Not Implemented |
UU0154 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $10,215 | $3,044 | Implemented |
UU0154 # 06 Y:2019 | 06 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,947 | $2,000 | Not Implemented |
UK1908 # 17 Y:2019 | 17 | 2019 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $1,430 | $0 | Implemented |
UK1908 # 15 Y:2019 | 15 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $63,247 | $2,368 | Implemented |
UK1908 # 18 Y:2019 | 18 | 2019 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $21,879 | $28,230 | Not Implemented |
UK1908 # 11 Y:2019 | 11 | 2019 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $13,831 | $5,000 | Not Implemented |
UK1908 # 08 Y:2019 | 08 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $914 | $720 | Not Implemented |
UK1908 # 09 Y:2019 | 09 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,838 | $1,900 | Implemented |
UK1908 # 10 Y:2019 | 10 | 2019 | REDUCE FLUID FLOW RATES | $2,913 | $1,900 | Not Implemented |
UK1908 # 13 Y:2019 | 13 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,547 | $8,300 | Implemented |
UK1908 # 14 Y:2019 | 14 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,671 | $2,684 | Not Implemented |
UK1908 # 07 Y:2019 | 07 | 2019 | DISCONNECT BALLASTS | $383 | $72 | Implemented |