IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,374

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0205 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $376,439 $1,600 Not Implemented
TT0205 # 03 Y:2018 03 2018 METER WASTE WATER $30,463 $1,000 Not Implemented
TT0205 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $28,188 $132,000 Not Implemented
TT0205 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,941 $160 Not Implemented
TT0205 # 06 Y:2018 06 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $9,911 $10,800 Not Implemented
TT0205 # 07 Y:2018 07 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $8,761 $8,362 Not Implemented
TT0205 # 08 Y:2018 08 2018 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $5,176 $6,900 Not Implemented
UK1803 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,357 $20,012 Implemented
UK1803 # 02 Y:2018 02 2018 INSTALL SKYLIGHTS $1,573 $1,350 Implemented
UK1803 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $3,813 $2,725 Implemented
UK1803 # 04 Y:2018 04 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,829 $2,692 Not Implemented
UK1803 # 05 Y:2018 05 2018 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $6,490 $0 Implemented
UK1803 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,186 $0 Implemented
UK1803 # 07 Y:2018 07 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,073 $0 Not Implemented
UK1803 # 08 Y:2018 08 2018 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $11,157 $30,000 Implemented
UK1803 # 09 Y:2018 09 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,139 $2,318 Implemented
UK1803 # 10 Y:2018 10 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,074 $3,248 Not Implemented
UK1803 # 11 Y:2018 11 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,228 $1,240 Not Implemented
UK1803 # 12 Y:2018 12 2018 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,060 $15,293 Not Implemented
UK1803 # 13 Y:2018 13 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $13,386 $0 Implemented
UK1803 # 14 Y:2018 14 2018 INSULATE BARE EQUIPMENT $492 $316 Implemented
UK1803 # 15 Y:2018 15 2018 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $946 $0 Implemented
UK1803 # 16 Y:2018 16 2018 DEVELOP A REPAIR/REPLACE POLICY $8,190 $10,600 Implemented
UK1803 # 17 Y:2018 17 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,465 $300 Implemented
UK1803 # 18 Y:2018 18 2018 OPTIMIZE PLANT POWER FACTOR $28,337 $47,985 Implemented