IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,441

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0045 # 10 Y:2024 10 2024 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,014 $4,165 Not Implemented
MU0045 # 11 Y:2024 11 2024 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,256 $1,302 Not Implemented
MU0045 # 12 Y:2024 12 2024 MINIMIZE WATER USAGE $25,914 $8,239 Not Implemented
MU0045 # 13 Y:2024 13 2024 MINIMIZE WATER USAGE $60,609 $146,420 Not Implemented
MU0045 # 14 Y:2024 14 2024 PAY BILLS ON TIME TO AVOID LATE FEES $4,768 $0 Not Implemented
LE0569 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,033 $21,165 Not Implemented
LE0569 # 05 Y:2024 05 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,415 $1,500 Implemented
LE0569 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $912 $1,400 Implemented
LE0569 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,637 $0 Implemented
LE0569 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,781 $400 Implemented
LE0569 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $92 $70 Implemented
GT0977 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $85,518 $1,850 Implemented
GT0977 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,957 $1,500 Implemented
GT0977 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,128 $14,000 Implemented
GT0977 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,327 $12,892 Implemented
GT0977 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $72,598 $1,299,381 Not Implemented
UU0248 # 01 Y:2024 01 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $980 $2,600 Implemented
UU0248 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,740 $1,270 Implemented
UU0248 # 03 Y:2024 03 2024 USE AUTOMATIC FLOW CONTROL $820 $4,250 Not Implemented
UU0248 # 04 Y:2024 04 2024 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $33,420 $319,250 Implemented
UU0248 # 05 Y:2024 05 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,380 $133,800 Not Implemented
UU0248 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $940 $3,000 Implemented
UU0248 # 07 Y:2024 07 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,570 $9,360 Not Implemented
IP0191 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $18,779 $0 Not Implemented
IP0191 # 02 Y:2024 02 2024 USE OPTIMUM TEMPERATURE $4,978 $384 Not Implemented