Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,374
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0490 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,569 | $3,905 | Implemented |
WV0490 # 06 Y:2014 | 06 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,812 | $500 | Implemented |
WV0490 # 05 Y:2014 | 05 | 2014 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $2,052 | $10,000 | Implemented |
WV0490 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,449 | $364 | Implemented |
WV0490 # 03 Y:2014 | 03 | 2014 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,124 | $1,000 | Not Implemented |
WV0490 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,883 | $16,722 | Implemented |
WV0490 # 01 Y:2014 | 01 | 2014 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $10,882 | $5,000 | Implemented |
UD0904 # 01 Y:2014 | 01 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,181 | $0 | Implemented |
UD0904 # 02 Y:2014 | 02 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,875 | $0 | Implemented |
UD0904 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $3,359 | $450 | Implemented |
UD0904 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,024 | $5,000 | Implemented |
UD0904 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $33,689 | $62,131 | Not Implemented |
UD0904 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,892 | $0 | Implemented |
UD0904 # 07 Y:2014 | 07 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $777 | $384 | Not Implemented |
UD0904 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $66,236 | $75,700 | Implemented |
UD0904 # 09 Y:2014 | 09 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,039 | $0 | Not Implemented |
UD0904 # 10 Y:2014 | 10 | 2014 | USE OPTIMUM THICKNESS INSULATION | $16,866 | $20,982 | Implemented |
UD0904 # 11 Y:2014 | 11 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,786 | $10,400 | Implemented |
UD0904 # 12 Y:2014 | 12 | 2014 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $96,196 | $72,000 | Not Implemented |
UD0904 # 13 Y:2014 | 13 | 2014 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $69,423 | $62,000 | Not Implemented |
UD0904 # 14 Y:2014 | 14 | 2014 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $47,628 | $1,300 | Not Implemented |
WV0487 # 01 Y:2014 | 01 | 2014 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $83,149 | $50,000 | Not Implemented |
WV0487 # 02 Y:2014 | 02 | 2014 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $34,136 | $82,440 | Not Implemented |
WV0487 # 03 Y:2014 | 03 | 2014 | OPTIMIZE PLANT POWER FACTOR | $12,000 | $56,000 | Not Implemented |
WV0487 # 04 Y:2014 | 04 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $10,990 | $7,560 | Implemented |