IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,374

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0005 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $683 $0 Implemented
IP0005 # 04 Y:2012 04 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $997 $1,803 Not Implemented
IP0005 # 05 Y:2012 05 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $16,542 $37,000 Not Implemented
TT0098 # 01 Y:2012 01 2012 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,053 $1,116 Implemented
TT0098 # 02 Y:2012 02 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,222 $2,320 Implemented
TT0098 # 03 Y:2012 03 2012 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $1,898 $5,525 Not Implemented
TT0098 # 04 Y:2012 04 2012 USE SOLAR HEAT TO HEAT MAKE-UP AIR $5,814 $43,695 Not Implemented
TT0098 # 05 Y:2012 05 2012 REPAIR AND ELIMINATE STEAM LEAKS $7,381 $980 Implemented
TT0097 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $62,026 $78,780 Implemented
TT0097 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,306 $19,700 Not Implemented
TT0097 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,167 $106,204 Implemented
UA0084 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $23,489 $160 Implemented
UA0084 # 02 Y:2012 02 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,919 $640 Not Implemented
UA0084 # 03 Y:2012 03 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,106 $2,157 Implemented
UA0084 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,492 $9,195 Implemented
UA0084 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,491 $800 Not Implemented
UA0084 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,837 $4,093 Not Implemented
UA0084 # 07 Y:2012 07 2012 PAY UTILITY BILLS ON TIME $812 $30 Implemented
WM0008 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $16,760 $0 Not Implemented
WM0008 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $8,834 $0 Not Implemented
WM0008 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,802 $0 Not Implemented
WM0008 # 04 Y:2012 04 2012 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $40,676 $83,400 Not Implemented
WM0008 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,551 $1,000 Not Implemented
WM0008 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $2,737 $0 Not Implemented
WM0008 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $432 $520 Not Implemented