IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

133

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0608 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $100,291 $322,608 n/a
UF0608 # 03 Y:2023 03 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,437 $3,636 n/a
UF0608 # 07 Y:2023 07 2023 UPGRADE CONTROLS ON COMPRESSORS $1,138 $5,400 n/a
UF0608 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,789 $7,200 n/a
UF0608 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,445 $25,640 n/a
UF0608 # 04 Y:2023 04 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,417 $9,340 n/a
UF0608 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,526 $10,560 n/a
UF0572 # 07 Y:2022 07 2022 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,245 $11,975 Implemented
UF0572 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $27,950 $26,859 Implemented
UF0572 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $56,857 $359,360 Implemented
UF0572 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,414 $756 Implemented
UF0572 # 08 Y:2022 08 2022 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,635 $4,650 Implemented
UF0572 # 03 Y:2022 03 2022 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $4,159 $10,627 Implemented
UF0572 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $4,007 $8,760 Implemented
UF0572 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,152 $3,218 Implemented
UF0504 # 03 Y:2017 03 2017 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,236 $700 Not Implemented
UF0504 # 05 Y:2017 05 2017 INSTALL AN UNINTERUPTABLE POWER SUPPLY $15,187 $28,820 Not Implemented
UF0504 # 06 Y:2017 06 2017 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $9,360 $3,600 Not Implemented
UF0504 # 04 Y:2017 04 2017 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $352,554 $180,000 Not Implemented
UF0504 # 02 Y:2017 02 2017 ADD AREA LIGHTING SWITCHES $2,381 $2,240 Not Implemented
UF0504 # 01 Y:2017 01 2017 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $12,636 $39,000 Not Implemented
MI0297 # 03 Y:2016 03 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $40,957 $1,120 Not Implemented
MI0297 # 01 Y:2016 01 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $97,105 $82,600 Not Implemented
MI0297 # 02 Y:2016 02 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $65,063 $200,000 Not Implemented
MI0297 # 10 Y:2016 10 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,934 $10,031 Not Implemented