Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
133
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0608 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $100,291 | $322,608 | Not Implemented |
UF0608 # 03 Y:2023 | 03 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,437 | $3,636 | Implemented |
UF0608 # 07 Y:2023 | 07 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $1,138 | $5,400 | Implemented |
UF0608 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,789 | $7,200 | Implemented |
UF0608 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,445 | $25,640 | Not Implemented |
UF0608 # 04 Y:2023 | 04 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,417 | $9,340 | Implemented |
UF0608 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,526 | $10,560 | Implemented |
UF0572 # 07 Y:2022 | 07 | 2022 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $12,245 | $11,975 | Implemented |
UF0572 # 02 Y:2022 | 02 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $27,950 | $26,859 | Implemented |
UF0572 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $56,857 | $359,360 | Implemented |
UF0572 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,414 | $756 | Implemented |
UF0572 # 08 Y:2022 | 08 | 2022 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $5,635 | $4,650 | Implemented |
UF0572 # 03 Y:2022 | 03 | 2022 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $4,159 | $10,627 | Implemented |
UF0572 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $4,007 | $8,760 | Implemented |
UF0572 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,152 | $3,218 | Implemented |
UF0504 # 03 Y:2017 | 03 | 2017 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,236 | $700 | Not Implemented |
UF0504 # 05 Y:2017 | 05 | 2017 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $15,187 | $28,820 | Not Implemented |
UF0504 # 06 Y:2017 | 06 | 2017 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $9,360 | $3,600 | Not Implemented |
UF0504 # 04 Y:2017 | 04 | 2017 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $352,554 | $180,000 | Not Implemented |
UF0504 # 02 Y:2017 | 02 | 2017 | ADD AREA LIGHTING SWITCHES | $2,381 | $2,240 | Not Implemented |
UF0504 # 01 Y:2017 | 01 | 2017 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $12,636 | $39,000 | Not Implemented |
MI0297 # 03 Y:2016 | 03 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $40,957 | $1,120 | Not Implemented |
MI0297 # 01 Y:2016 | 01 | 2016 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $97,105 | $82,600 | Not Implemented |
MI0297 # 02 Y:2016 | 02 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $65,063 | $200,000 | Not Implemented |
MI0297 # 10 Y:2016 | 10 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,934 | $10,031 | Not Implemented |