IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0698 # 04 Y:2018 04 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,148 $325 Implemented
OR0698 # 03 Y:2018 03 2018 USE HEAT PUMP FOR SPACE CONDITIONING $12,461 $22,850 Implemented
OR0698 # 02 Y:2018 02 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $18,374 $9,440 Implemented
OR0698 # 01 Y:2018 01 2018 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $32,214 $597 Not Implemented
OR0326 # 04 Y:1998 04 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,856 $1,210 Implemented
OR0326 # 08 Y:1998 08 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,920 $3,680 Not Implemented
OR0326 # 07 Y:1998 07 1998 USE OTHER WASTE CONCENTRATION METHODS $20,930 $13,295 Implemented
OR0326 # 06 Y:1998 06 1998 OPTIMIZE PLANT POWER FACTOR $1,559 $10,400 Not Implemented
OR0326 # 05 Y:1998 05 1998 ADJUST BURNERS FOR EFFICIENT OPERATION $1,680 $405 Not Implemented
OR0326 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,653 $1,000 Implemented
OR0326 # 02 Y:1998 02 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $6,000 $0 Not Implemented
OR0326 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,520 $83,400 Not Implemented
OR0305 # 01 Y:1997 01 1997 REDUCE SCRAP PRODUCTION $89,400 $15,300 Not Implemented
OR0305 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,860 $2,500 Implemented
OR0305 # 05 Y:1997 05 1997 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $1,990 $0 Implemented
OR0305 # 04 Y:1997 04 1997 CONVERT TO ELECTROSTATIC POWDER COATING $8,400 $4,900 Implemented
OR0305 # 03 Y:1997 03 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,130 $1,200 Implemented
OR0305 # 02 Y:1997 02 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $24,200 $139,000 Not Implemented