Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
79
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0186 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $822 | $1,645 | Implemented |
UU0186 # 03 Y:2021 | 03 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,796 | $4,794 | Not Implemented |
UU0186 # 06 Y:2021 | 06 | 2021 | ADD AREA LIGHTING SWITCHES | $398 | $883 | Implemented |
UU0186 # 05 Y:2021 | 05 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $544 | $200 | Implemented |
UU0186 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,919 | $19,705 | Implemented |
UU0186 # 02 Y:2021 | 02 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,932 | $15,000 | Not Implemented |
UU0178 # 06 Y:2021 | 06 | 2021 | Hire Energy Manager | $25,000 | $7,800 | Not Implemented |
UU0178 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,197 | $9,700 | Not Implemented |
UU0178 # 02 Y:2021 | 02 | 2021 | INSULATE BARE EQUIPMENT | $8,654 | $3,913 | Not Implemented |
UU0178 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $30,811 | $1,300 | Not Implemented |
UU0178 # 04 Y:2021 | 04 | 2021 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $99,244 | $320,000 | Not Implemented |
UU0178 # 03 Y:2021 | 03 | 2021 | INSULATE BARE EQUIPMENT | $4,347 | $9,400 | Not Implemented |
UU0176 # 07 Y:2021 | 07 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,411 | $5,700 | Implemented |
UU0176 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,012 | $22,700 | Not Implemented |
UU0176 # 03 Y:2021 | 03 | 2021 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $29,753 | $10,400 | Implemented |
UU0176 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,766 | $7,600 | Implemented |
UU0176 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $94,747 | $42,608 | Implemented |
UU0176 # 01 Y:2021 | 01 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $156,566 | $187,200 | Not Implemented |
UU0176 # 04 Y:2021 | 04 | 2021 | OPTIMIZE PLANT POWER FACTOR | $23,470 | $21,270 | Not Implemented |
UU0170 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $1,259 | $1,259 | Not Implemented |
UU0170 # 02 Y:2020 | 02 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,868 | $2,000 | Implemented |
UU0170 # 06 Y:2020 | 06 | 2020 | INSULATE BARE EQUIPMENT | $676 | $440 | Implemented |
UU0170 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,825 | $21,841 | Implemented |
UU0170 # 03 Y:2020 | 03 | 2020 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $1,681 | $1,200 | Not Implemented |
UU0170 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,521 | $150 | Implemented |