Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsSIC | 371 | Motor Vehicles And Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0620 # 01 Y:2022 | 01 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $13,903 | $67,984 | Not Implemented |
WV0620 # 03 Y:2022 | 03 | 2022 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $7,597 | $37,000 | Not Implemented |
WV0620 # 05 Y:2022 | 05 | 2022 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $4,159 | $8,300 | Not Implemented |
WV0620 # 10 Y:2022 | 10 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,028 | $9,280 | Not Implemented |
WV0620 # 09 Y:2022 | 09 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,129 | $1,773 | Not Implemented |
WV0620 # 08 Y:2022 | 08 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $2,669 | $3,970 | Not Implemented |
WV0620 # 07 Y:2022 | 07 | 2022 | OPTIMIZE PLANT POWER FACTOR | $2,785 | $7,090 | Implemented |
WV0620 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,394 | $7,905 | Implemented |
WV0620 # 04 Y:2022 | 04 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,233 | $660 | Implemented |
WV0620 # 02 Y:2022 | 02 | 2022 | USE EVAPORATION TO CONCENTRATE MATERIAL | $9,086 | $4,900 | Not Implemented |
WV0229 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $755 | $400 | Not Implemented |
WV0229 # 07 Y:2001 | 07 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $861 | $400 | Not Implemented |
WV0229 # 08 Y:2001 | 08 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,323 | $1,200 | Implemented |
WV0229 # 05 Y:2001 | 05 | 2001 | USE SYNTHETIC LUBRICANT | $1,215 | $450 | Implemented |
WV0229 # 04 Y:2001 | 04 | 2001 | INSTALL TIMERS AND/OR THERMOSTATS | $3,599 | $350 | Not Implemented |
WV0229 # 12 Y:2001 | 12 | 2001 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $13,680 | $220 | Implemented |
WV0229 # 09 Y:2001 | 09 | 2001 | INSTALL SPECTRAL REFLECTORS / DELAMP | $6,189 | $11,368 | Not Implemented |
WV0229 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,684 | $4,400 | Not Implemented |
WV0229 # 02 Y:2001 | 02 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $776 | $750 | Implemented |
WV0229 # 01 Y:2001 | 01 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $948 | $300 | Implemented |
WV0229 # 10 Y:2001 | 10 | 2001 | INSTALL OCCUPANCY SENSORS | $2,118 | $450 | Not Implemented |
WV0229 # 14 Y:2001 | 14 | 2001 | ADVERTISE PRODUCT OR SERVICE | $13,200 | $2,000 | Implemented |
WV0229 # 11 Y:2001 | 11 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,192 | $100 | Implemented |
WV0229 # 13 Y:2001 | 13 | 2001 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $45,000 | $15,000 | Implemented |
WV0185 # 08 Y:2000 | 08 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $12,960 | $800 | Implemented |