IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0347 # 04 Y:2006 04 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,125 $22,000 Implemented
NC0347 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,347 $100 Implemented
NC0347 # 01 Y:2006 01 2006 DEVELOP A REPAIR/REPLACE POLICY $6,708 $0 Implemented
NC0347 # 05 Y:2006 05 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,239 $5,000 Not Implemented
NC0347 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,895 $3,400 Implemented
NC0347 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $269 $283 Implemented
NC0347 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,060 $5,000 Implemented
NC0347 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $95 $165 Not Implemented
GT0829 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,460 $13,714 Not Implemented
GT0829 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,510 $11,358 Not Implemented
GT0829 # 02 Y:2006 02 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $45,543 $32,500 Not Implemented
GT0829 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,481 $500 Implemented
UM0309 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,830 $33,667 Not Implemented
UM0309 # 01 Y:2006 01 2006 HEAT WATER WITH EXHAUST HEAT $292,769 $50,000 Not Implemented
UM0309 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $4,362 $7,550 Not Implemented
UM0309 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $11,143 $13,000 Not Implemented
UM0309 # 02 Y:2006 02 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $32,329 $10,600 Not Implemented
WI0522 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,685 $1,920 Implemented
WI0522 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $69,304 $182,880 Implemented
WI0522 # 02 Y:2006 02 2006 IMPROVE SPACE COMFORT CONDITIONING $14,000 $3,000 Implemented
WI0522 # 04 Y:2006 04 2006 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $7,457 $3,000 Not Implemented
WI0522 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,607 $2,000 Implemented
WI0522 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,544 $0 Implemented
WI0522 # 07 Y:2006 07 2006 DISTILL CONTAMINATED SOLVENTS FOR REUSE $4,560 $12,105 Not Implemented
IA0392 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,749 $7,994 Implemented