IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

489

matching recommendations
Reset
SIC 3711 Motor Vehicles And Car Bodies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0185 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,414 $4,645 Implemented
UA0185 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $342 $85 Implemented
UA0174 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $435,778 $988,290 Not Implemented
UA0174 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,405 $588 Implemented
UA0174 # 03 Y:2017 03 2017 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $49,747 $100,000 Not Implemented
UA0174 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $221 $564 Implemented
UA0174 # 05 Y:2017 05 2017 USE OPTIMUM TEMPERATURE $33,738 $8,460 Implemented
UA0174 # 06 Y:2017 06 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $826 $2,820 Implemented
UA0174 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,033 $42,204 Not Implemented
UM0475 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,675 $3,500 n/a
UM0475 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $8,944 $3,740 n/a
UM0475 # 03 Y:2017 03 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $780 $350 n/a
UM0475 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $713 $3,700 n/a
CO0717 # 01 Y:2015 01 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,160 $2,130 n/a
CO0717 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $480 n/a
CO0717 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $380 $100 n/a
CO0717 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,880 $35,080 n/a
CO0717 # 05 Y:2015 05 2015 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $3,660 $13,800 n/a
CO0717 # 06 Y:2015 06 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,270 $1,000 n/a
CO0717 # 07 Y:2015 07 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,080 $3,220 n/a
SU0387 # 01 Y:2015 01 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,803 $0 Not Implemented
SU0387 # 02 Y:2015 02 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,211 $0 Not Implemented
SU0387 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $988 $858 Not Implemented
SU0387 # 04 Y:2015 04 2015 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $15,923 $25,000 Not Implemented
SU0387 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $776 $1,546 Not Implemented