IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

489

matching recommendations
Reset
SIC 3711 Motor Vehicles And Car Bodies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0872 # 01 Y:2014 01 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,899 $8,580 Implemented
OK0872 # 02 Y:2014 02 2014 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,062 $780 Implemented
OK0872 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,779 $1,750 Implemented
OK0872 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $883 $689 Implemented
OK0872 # 05 Y:2014 05 2014 USE RADIANT HEATER FOR SPOT HEATING $19,356 $74,750 Not Implemented
OK0872 # 06 Y:2014 06 2014 INSTALL TIMERS AND/OR THERMOSTATS $2,318 $1,148 Not Implemented
OK0872 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $153 $285 Not Implemented
OK0872 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,001 $64,468 Not Implemented
OK0872 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $446 $0 Not Implemented
WM0030 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,439 $1,853 Not Implemented
WM0030 # 02 Y:2013 02 2013 USE RADIANT HEATER FOR SPOT HEATING $17,111 $9,180 Not Implemented
WM0030 # 03 Y:2013 03 2013 USE PHOTOCELL CONTROLS $2,234 $4,550 Not Implemented
WM0030 # 04 Y:2013 04 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,570 $500 Not Implemented
WM0030 # 05 Y:2013 05 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,064 $0 Not Implemented
WM0030 # 06 Y:2013 06 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $34,398 $69,000 Implemented
WM0030 # 07 Y:2013 07 2013 MODIFY STARTUP/SHUTDOWN TIMES $3,034 $0 Not Implemented
WM0030 # 08 Y:2013 08 2013 INSTALL OCCUPANCY SENSORS $473 $546 Not Implemented
UM0431 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $25,011 $30,000 Implemented
UM0431 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,730 $38,000 Not Implemented
UM0431 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,100 $200 Not Implemented
UM0431 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,832 $2,500 Not Implemented
MZ0125 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $1,108 $480 Implemented
MZ0125 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,168 $9,300 Implemented
MZ0125 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,107 $1,300 Implemented
UD0872 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $10,877 $5,000 Implemented