IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
SIC 3711 Motor Vehicles And Car Bodies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0013 # 06 Y:2022 06 2022 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $51 $30 Implemented
UM0431 # 01 Y:2013 01 2013 OPTIMIZE PLANT POWER FACTOR $25,011 $30,000 Implemented
UM0353 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $186,999 $237,500 Implemented
UM0353 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $26,834 $500 Implemented
UM0353 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $22,368 $3,000 Implemented
UM0353 # 06 Y:2009 06 2009 USE OPTIMUM TEMPERATURE $13,085 $200 Implemented
UM0353 # 08 Y:2009 08 2009 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,526 $1,500 Implemented
UM0202 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $100 $1,150 Implemented
UM0202 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,069 $1,000 Implemented
UM0202 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,487 $450 Implemented
UM0202 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $10,288 $1,195 Implemented
UM0202 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $737 $1,145 Implemented
UM0202 # 07 Y:2002 07 2002 OPTIMIZE PLANT POWER FACTOR $1,180 $2,590 Implemented
UM0109 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $168 $208 Implemented
UM0109 # 06 Y:1998 06 1998 $44,450 $100 Implemented