Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 3711 | Motor Vehicles And Car Bodies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0446 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,646 | $4,652 | n/a |
MS0446 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,927 | $24,500 | n/a |
MS0446 # 02 Y:2025 | 02 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $25,744 | $100,000 | n/a |
MS0446 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $66,685 | $716,889 | n/a |
MS0445 # 01 Y:2025 | 01 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $17,535 | $200,000 | n/a |
MS0445 # 07 Y:2025 | 07 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $27,723 | $35,999 | n/a |
MS0445 # 06 Y:2025 | 06 | 2025 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,573 | $2,502 | n/a |
MS0445 # 05 Y:2025 | 05 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $12,178 | $45,000 | n/a |
MS0445 # 04 Y:2025 | 04 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $40,482 | $25,536 | n/a |
MS0445 # 03 Y:2025 | 03 | 2025 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $395 | $0 | n/a |
MS0445 # 02 Y:2025 | 02 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $8,629 | $44,500 | n/a |
MS0429 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $16,143 | $0 | n/a |
MS0429 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $5,847 | $35,728 | n/a |
MS0429 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,731 | $8,233 | n/a |
MS0428 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $788 | $1,677 | n/a |
MS0428 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $647 | $0 | n/a |
MS0428 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $11,631 | $131,059 | n/a |
TT0212 # 07 Y:2018 | 07 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,248 | $34,845 | Not Implemented |
TT0212 # 05 Y:2018 | 05 | 2018 | METER WASTE WATER | $34,128 | $1,900 | Implemented |
TT0212 # 06 Y:2018 | 06 | 2018 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $17,427 | $79,168 | Not Implemented |
TT0212 # 11 Y:2018 | 11 | 2018 | INSTALL OCCUPANCY SENSORS | $283 | $250 | Implemented |
TT0212 # 08 Y:2018 | 08 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,795 | $16,665 | Not Implemented |
TT0212 # 09 Y:2018 | 09 | 2018 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $3,775 | $5,000 | Implemented |
TT0212 # 10 Y:2018 | 10 | 2018 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $2,270 | $1,720 | Not Implemented |
TT0212 # 04 Y:2018 | 04 | 2018 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $38,635 | $13,000 | Implemented |