IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 3711 Motor Vehicles And Car Bodies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0327 # 08 Y:2011 08 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $360 $400 Not Implemented
LE0327 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,286 $1,900 Implemented
LE0327 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $5,653 $7,280 Not Implemented
LE0327 # 05 Y:2011 05 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,778 $2,102 Not Implemented
LE0327 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,335 $94,400 Not Implemented
LE0327 # 01 Y:2011 01 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $92,227 $175,000 Implemented
LE0327 # 02 Y:2011 02 2011 REPLACE BOILER $91,620 $240,000 Not Implemented
LE0327 # 03 Y:2011 03 2011 INSTALL TIMERS AND/OR THERMOSTATS $61,378 $125 Implemented
WV0178 # 06 Y:1999 06 1999 INSULATE BARE EQUIPMENT $7,766 $2,000 Implemented
WV0178 # 10 Y:1999 10 1999 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $164,498 $0 Implemented
WV0178 # 05 Y:1999 05 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $431 $105 Not Implemented
WV0178 # 04 Y:1999 04 1999 USE SYNTHETIC LUBRICANT $2,758 $550 Not Implemented
WV0178 # 03 Y:1999 03 1999 DISCONNECT BALLASTS $16,730 $0 Implemented
WV0178 # 02 Y:1999 02 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $2,919 $165 Implemented
WV0178 # 01 Y:1999 01 1999 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $23,912 $0 Not Implemented
WV0178 # 07 Y:1999 07 1999 RECOVER WASTE HEAT FROM EQUIPMENT $5,726 $870 Not Implemented
WV0178 # 08 Y:1999 08 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,578 $1,000 Not Implemented
WV0178 # 12 Y:1999 12 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,200 $100 Not Implemented
WV0178 # 09 Y:1999 09 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,104 $1,315 Not Implemented
WV0178 # 11 Y:1999 11 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $184 $0 Implemented
WV0178 # 13 Y:1999 13 1999 $611,520 $0 Not Implemented
HO0170 # 11 Y:1998 11 1998 $24,440 $500 Not Implemented
HO0170 # 08 Y:1998 08 1998 $4,800 $5,200 Implemented
HO0170 # 06 Y:1998 06 1998 USE RADIANT HEATER FOR SPOT HEATING $3,205 $9,600 Implemented
HO0170 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,250 $200 Not Implemented