Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
597
matching recommendationsSIC | 3714 | Motor Vehicle Parts And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0907 # 06 Y:2014 | 06 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $314 | $500 | Implemented |
UD0907 # 07 Y:2014 | 07 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,566 | $0 | Not Implemented |
UD0907 # 08 Y:2014 | 08 | 2014 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $4,440 | $0 | Implemented |
UD0904 # 01 Y:2014 | 01 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,181 | $0 | Implemented |
UD0904 # 02 Y:2014 | 02 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,875 | $0 | Implemented |
UD0904 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $3,359 | $450 | Implemented |
UD0904 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,024 | $5,000 | Implemented |
UD0904 # 05 Y:2014 | 05 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $33,689 | $62,131 | Not Implemented |
UD0904 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,892 | $0 | Implemented |
UD0904 # 07 Y:2014 | 07 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $777 | $384 | Not Implemented |
UD0904 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $66,236 | $75,700 | Implemented |
UD0904 # 09 Y:2014 | 09 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,039 | $0 | Not Implemented |
UD0904 # 10 Y:2014 | 10 | 2014 | USE OPTIMUM THICKNESS INSULATION | $16,866 | $20,982 | Implemented |
UD0904 # 11 Y:2014 | 11 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,786 | $10,400 | Implemented |
UD0904 # 12 Y:2014 | 12 | 2014 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $96,196 | $72,000 | Not Implemented |
UD0904 # 13 Y:2014 | 13 | 2014 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $69,423 | $62,000 | Not Implemented |
UD0904 # 14 Y:2014 | 14 | 2014 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $47,628 | $1,300 | Not Implemented |
UM0418 # 01 Y:2012 | 01 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $795,000 | $1,715,000 | Not Implemented |
UM0418 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,459 | $84,630 | Implemented |
UM0418 # 03 Y:2012 | 03 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $151,000 | $60,000 | Not Implemented |
UM0418 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,257 | $7,500 | Not Implemented |
UD0871 # 01 Y:2012 | 01 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,905 | $0 | Not Implemented |
UD0871 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $597 | $950 | Not Implemented |
UD0871 # 03 Y:2012 | 03 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $488 | $0 | Not Implemented |
UD0871 # 04 Y:2012 | 04 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $27,260 | $0 | Not Implemented |