IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0420 # 06 Y:2009 06 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $21,915 $607 Not Implemented
UF0420 # 05 Y:2009 05 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,022 $10,000 Not Implemented
UF0420 # 01 Y:2009 01 2009 PAY UTILITY BILLS ON TIME $10,674 $0 Not Implemented
UF0420 # 02 Y:2009 02 2009 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $5,219 $2,785 Not Implemented
UF0420 # 03 Y:2009 03 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $30,946 $12,360 Not Implemented
UF0420 # 12 Y:2009 12 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,333 $760 Not Implemented
UF0420 # 09 Y:2009 09 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,954 $3,000 Not Implemented
MI0085 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $263 $102 Implemented
MI0085 # 06 Y:2004 06 2004 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $20,000 $0 Not Implemented
MI0085 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $-19 $2,670 Implemented
MI0085 # 04 Y:2004 04 2004 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $1,834 $130 Implemented
MI0085 # 03 Y:2004 03 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $868 $0 Not Implemented
MI0085 # 02 Y:2004 02 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,699 $1,200 Implemented
MI0085 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $8,514 $2,300 Implemented
MI0013 # 01 Y:2001 01 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $1,255 $710 Not Implemented
MI0013 # 02 Y:2001 02 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $114,000 $32,515 Not Implemented
MI0013 # 03 Y:2001 03 2001 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $3,000 $5,000 Not Implemented
MI0013 # 04 Y:2001 04 2001 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $6,641 $1,050 Not Implemented
MI0013 # 05 Y:2001 05 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $3,176 $4,500 Not Implemented
MI0013 # 06 Y:2001 06 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $9,000 $680 Not Implemented
MI0013 # 07 Y:2001 07 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,791 $15 Not Implemented
UF0131 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $845 $350 Implemented
UF0131 # 09 Y:1995 09 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $110,283 $250,000 Not Implemented
UF0131 # 07 Y:1995 07 1995 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,226 $11,400 Not Implemented
UF0131 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,001 $1,116 Not Implemented