Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
65
matching recommendationsSIC | 3714 | Motor Vehicle Parts And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0420 # 06 Y:2009 | 06 | 2009 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $21,915 | $607 | Not Implemented |
UF0420 # 05 Y:2009 | 05 | 2009 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,022 | $10,000 | Not Implemented |
UF0420 # 01 Y:2009 | 01 | 2009 | PAY UTILITY BILLS ON TIME | $10,674 | $0 | Not Implemented |
UF0420 # 02 Y:2009 | 02 | 2009 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $5,219 | $2,785 | Not Implemented |
UF0420 # 03 Y:2009 | 03 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $30,946 | $12,360 | Not Implemented |
UF0420 # 12 Y:2009 | 12 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,333 | $760 | Not Implemented |
UF0420 # 09 Y:2009 | 09 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $13,954 | $3,000 | Not Implemented |
MI0085 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $263 | $102 | Implemented |
MI0085 # 06 Y:2004 | 06 | 2004 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $20,000 | $0 | Not Implemented |
MI0085 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $-19 | $2,670 | Implemented |
MI0085 # 04 Y:2004 | 04 | 2004 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $1,834 | $130 | Implemented |
MI0085 # 03 Y:2004 | 03 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $868 | $0 | Not Implemented |
MI0085 # 02 Y:2004 | 02 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $21,699 | $1,200 | Implemented |
MI0085 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,514 | $2,300 | Implemented |
MI0013 # 01 Y:2001 | 01 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $1,255 | $710 | Not Implemented |
MI0013 # 02 Y:2001 | 02 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $114,000 | $32,515 | Not Implemented |
MI0013 # 03 Y:2001 | 03 | 2001 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $3,000 | $5,000 | Not Implemented |
MI0013 # 04 Y:2001 | 04 | 2001 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $6,641 | $1,050 | Not Implemented |
MI0013 # 05 Y:2001 | 05 | 2001 | INSTALL SPECTRAL REFLECTORS / DELAMP | $3,176 | $4,500 | Not Implemented |
MI0013 # 06 Y:2001 | 06 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $9,000 | $680 | Not Implemented |
MI0013 # 07 Y:2001 | 07 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,791 | $15 | Not Implemented |
UF0131 # 08 Y:1995 | 08 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $845 | $350 | Implemented |
UF0131 # 09 Y:1995 | 09 | 1995 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $110,283 | $250,000 | Not Implemented |
UF0131 # 07 Y:1995 | 07 | 1995 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,226 | $11,400 | Not Implemented |
UF0131 # 06 Y:1995 | 06 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,001 | $1,116 | Not Implemented |