IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0543 # 07 Y:2015 07 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,398 $21,800 Not Implemented
NC0543 # 11 Y:2015 11 2015 DEVELOP A REPAIR/REPLACE POLICY $2,491 $4,256 Not Implemented
NC0543 # 12 Y:2015 12 2015 USE EVAPORATION TO CONCENTRATE MATERIAL $4,794 $19,000 Not Implemented
NC0543 # 10 Y:2015 10 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $8,618 $20,000 Not Implemented
NC0543 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $311 $80 Implemented
NC0543 # 08 Y:2015 08 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $192 $500 Implemented
NC0543 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,078 $68,997 Implemented
TT0017 # 05 Y:2008 05 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,947 $17,385 Not Implemented
TT0017 # 04 Y:2008 04 2008 INSTALL SKYLIGHTS $12,995 $22,450 Not Implemented
TT0017 # 03 Y:2008 03 2008 OPTIMIZE PLANT POWER FACTOR $1,370 $5,170 Not Implemented
TT0017 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $302 $324 Not Implemented
TT0017 # 01 Y:2008 01 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,583 $1,715 Not Implemented
TN0667 # 06 Y:1999 06 1999 OPTIMIZE PLANT POWER FACTOR $15,168 $29,100 Not Implemented
TN0667 # 01 Y:1999 01 1999 RECOVER AND REUSE WASTE MATERIAL $222,220 $77,760 Not Implemented
TN0667 # 02 Y:1999 02 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $52,782 $80,100 Implemented
TN0667 # 03 Y:1999 03 1999 METER WASTE WATER $26,280 $2,980 Implemented
TN0667 # 04 Y:1999 04 1999 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $22,500 $25,000 Not Implemented
TN0667 # 05 Y:1999 05 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $20,700 $21,780 Not Implemented
TN0645 # 02 Y:1998 02 1998 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $277,345 $644,800 Not Implemented
TN0645 # 01 Y:1998 01 1998 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT $408,630 $24,685 Implemented
TN0645 # 03 Y:1998 03 1998 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $237,600 $153,485 Not Implemented
TN0645 # 11 Y:1998 11 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,880 $5,000 Implemented
TN0645 # 10 Y:1998 10 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $9,390 $8,000 Implemented
TN0645 # 09 Y:1998 09 1998 INSTALL SET-BACK TIMERS $15,755 $1,555 Not Implemented
TN0645 # 04 Y:1998 04 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $221,455 $70,000 Not Implemented