IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

242

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0343 # 07 Y:2023 07 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $52,726 $2,400 n/a
MZ0343 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,575 $28,807 n/a
MZ0343 # 08 Y:2023 08 2023 OPTIMIZE PLANT POWER FACTOR $126,570 $196,842 n/a
MZ0343 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,510 $9,100 n/a
MZ0343 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,303 $5,150 n/a
MZ0343 # 04 Y:2023 04 2023 REPAIR AND ELIMINATE STEAM LEAKS $8,146 $1,330 n/a
MZ0343 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,711 $360 n/a
MZ0343 # 01 Y:2023 01 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,951 $31,059 n/a
MZ0343 # 09 Y:2023 09 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $175,679 $545,812 n/a
MZ0324 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $269 $340 Implemented
MZ0324 # 06 Y:2021 06 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $65,010 $664,200 Not Implemented
MZ0324 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,050 $7,800 Implemented
MZ0324 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,260 $480 Implemented
MZ0324 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,182 $17,137 Not Implemented
MZ0324 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,278 $240 Implemented
MZ0292 # 08 Y:2020 08 2020 USE PHOTOCELL CONTROLS $43 $73 Implemented
MZ0292 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $62,704 $59,378 Not Implemented
MZ0292 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $460 $1,000 Implemented
MZ0292 # 12 Y:2020 12 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $99,528 $502,000 Implemented
MZ0292 # 11 Y:2020 11 2020 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $147,061 $38,160 Not Implemented
MZ0292 # 07 Y:2020 07 2020 RECOVER WASTE HEAT FROM EQUIPMENT $18,874 $22,200 Not Implemented
MZ0292 # 10 Y:2020 10 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,760 $45,300 Not Implemented
MZ0292 # 09 Y:2020 09 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,588 $240 Implemented
MZ0292 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,645 $29,820 Implemented
MZ0292 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,098 $5,000 Implemented