Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
242
matching recommendationsSIC | 3714 | Motor Vehicle Parts And Accessories |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0343 # 07 Y:2023 | 07 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $52,726 | $2,400 | n/a |
MZ0343 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,575 | $28,807 | n/a |
MZ0343 # 08 Y:2023 | 08 | 2023 | OPTIMIZE PLANT POWER FACTOR | $126,570 | $196,842 | n/a |
MZ0343 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,510 | $9,100 | n/a |
MZ0343 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,303 | $5,150 | n/a |
MZ0343 # 04 Y:2023 | 04 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $8,146 | $1,330 | n/a |
MZ0343 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,711 | $360 | n/a |
MZ0343 # 01 Y:2023 | 01 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $4,951 | $31,059 | n/a |
MZ0343 # 09 Y:2023 | 09 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $175,679 | $545,812 | n/a |
MZ0324 # 03 Y:2021 | 03 | 2021 | INSTALL OCCUPANCY SENSORS | $269 | $340 | Implemented |
MZ0324 # 06 Y:2021 | 06 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,010 | $664,200 | Not Implemented |
MZ0324 # 02 Y:2021 | 02 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,050 | $7,800 | Implemented |
MZ0324 # 01 Y:2021 | 01 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,260 | $480 | Implemented |
MZ0324 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,182 | $17,137 | Not Implemented |
MZ0324 # 04 Y:2021 | 04 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,278 | $240 | Implemented |
MZ0292 # 08 Y:2020 | 08 | 2020 | USE PHOTOCELL CONTROLS | $43 | $73 | Implemented |
MZ0292 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $62,704 | $59,378 | Not Implemented |
MZ0292 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $460 | $1,000 | Implemented |
MZ0292 # 12 Y:2020 | 12 | 2020 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $99,528 | $502,000 | Implemented |
MZ0292 # 11 Y:2020 | 11 | 2020 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $147,061 | $38,160 | Not Implemented |
MZ0292 # 07 Y:2020 | 07 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,874 | $22,200 | Not Implemented |
MZ0292 # 10 Y:2020 | 10 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,760 | $45,300 | Not Implemented |
MZ0292 # 09 Y:2020 | 09 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,588 | $240 | Implemented |
MZ0292 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,645 | $29,820 | Implemented |
MZ0292 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,098 | $5,000 | Implemented |