Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,491
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0058 # 02 Y:2021 | 02 | 2021 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $24,583 | $30,000 | Not Implemented |
NL0058 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,369 | $6,060 | Implemented |
NL0058 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,510 | $2,500 | Implemented |
NL0058 # 05 Y:2021 | 05 | 2021 | METER WASTE WATER | $2,893 | $1,106 | Not Implemented |
NL0058 # 06 Y:2021 | 06 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,164 | $728 | Not Implemented |
NL0058 # 07 Y:2021 | 07 | 2021 | INSTALL OCCUPANCY SENSORS | $896 | $997 | Not Implemented |
OK1045 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,011 | $14,146 | Implemented |
OK1045 # 02 Y:2021 | 02 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,431 | $0 | Implemented |
OK1045 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,356 | $512 | Not Implemented |
OK1045 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $527 | $0 | Implemented |
OK1045 # 05 Y:2021 | 05 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,363 | $528 | Implemented |
OK1045 # 06 Y:2021 | 06 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,380 | $0 | Implemented |
OK1045 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,188 | $2,563 | Implemented |
OK1045 # 08 Y:2021 | 08 | 2021 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $140 | $110 | Implemented |
OK1043 # 01 Y:2021 | 01 | 2021 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $2,091 | $8,000 | Implemented |
OK1043 # 02 Y:2021 | 02 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $331 | $1,650 | Implemented |
OK1043 # 03 Y:2021 | 03 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,309 | $35,400 | Implemented |
OK1043 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,397 | $2,946 | Implemented |
OK1043 # 05 Y:2021 | 05 | 2021 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $2,008 | $952 | Not Implemented |
MI0384 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $69,936 | $480 | Implemented |
MI0384 # 02 Y:2020 | 02 | 2020 | USE SOLAR HEAT TO HEAT WATER | $26,710 | $12,200 | Not Implemented |
MI0384 # 03 Y:2020 | 03 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $4,404 | $16,320 | Implemented |
MI0384 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,546 | $3,927 | Implemented |
MI0384 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,610 | $2,100 | Implemented |
MI0384 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,477 | $8,668 | Implemented |