IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

256

matching recommendations
Reset
SIC 372 Aircraft And Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0389 # 08 Y:2021 08 2021 USE COMPRESSOR AIR FILTERS $1,420 $1,100 Implemented
MI0389 # 07 Y:2021 07 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,000 $480 Not Implemented
MI0389 # 06 Y:2021 06 2021 INSULATE BARE EQUIPMENT $15,421 $6,812 Not Implemented
MI0389 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,025 $120 Implemented
MI0389 # 04 Y:2021 04 2021 INSTALL EFFICIENT RECTIFIERS $21,196 $55,920 Implemented
MI0389 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,739 $33,655 Implemented
MI0389 # 02 Y:2021 02 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $43,876 $480 Implemented
MI0389 # 01 Y:2021 01 2021 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $48,176 $80 Not Implemented
MI0384 # 01 Y:2020 01 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $69,936 $480 Implemented
MI0384 # 02 Y:2020 02 2020 USE SOLAR HEAT TO HEAT WATER $26,710 $12,200 Not Implemented
MI0384 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,572 $1,980 Implemented
MI0384 # 07 Y:2020 07 2020 PAY UTILITY BILLS ON TIME $1,659 $0 Implemented
MI0384 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,477 $8,668 Implemented
MI0384 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,610 $2,100 Implemented
MI0384 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,546 $3,927 Implemented
MI0384 # 03 Y:2020 03 2020 UPGRADE CONTROLS ON COMPRESSORS $4,404 $16,320 Implemented
MI0382 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,278 $3,204 Implemented
MI0382 # 04 Y:2020 04 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,045 $1,796 Not Implemented
MI0382 # 03 Y:2020 03 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $5,430 $2,740 Not Implemented
MI0382 # 02 Y:2020 02 2020 USE SOLAR HEAT TO HEAT WATER $7,209 $8,409 Not Implemented
MI0382 # 01 Y:2020 01 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,223 $3,645 Not Implemented
MI0382 # 06 Y:2020 06 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,088 $1,306 Not Implemented
MI0382 # 07 Y:2020 07 2020 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $964 $1,884 Implemented
MI0381 # 03 Y:2020 03 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,145 $2,400 Not Implemented
MI0381 # 01 Y:2020 01 2020 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $23,304 $57,960 Not Implemented