Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
SIC 372 Aircraft And Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0086 # 04 Y:2005 04 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,447 $21,000 Not Implemented
UU0086 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $773 $4,320 Not Implemented
UU0060 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,695 $4,800 Not Implemented
UU0060 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,202 $13,200 Implemented
UU0060 # 03 Y:2004 03 2004 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $5,059 $4,000 Implemented
UU0060 # 04 Y:2004 04 2004 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,047 $2,600 Not Implemented
UU0060 # 06 Y:2004 06 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,853 $0 Not Implemented
UU0060 # 07 Y:2004 07 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,897 $200 Implemented
UU0060 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $309 $723 Not Implemented
UU0053 # 06 Y:2003 06 2003 INSTALL TURBULATORS $2,610 $1,572 Not Implemented
UU0053 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,869 $2,340 Implemented
UU0053 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,112 $70,635 Not Implemented
UU0053 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,710 $2,000 Not Implemented
UU0053 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,131 $55 Not Implemented
UU0053 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,354 $4,100 Not Implemented
UU0050 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,684 $895 Not Implemented
UU0050 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,216 $5,500 Not Implemented
UU0050 # 02 Y:2003 02 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,838 $2,000 Not Implemented
UU0050 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,640 $4,342 Not Implemented
UU0050 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,075 $420 Not Implemented
UU0050 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $177 $390 Not Implemented
UU0050 # 06 Y:2003 06 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,400 $0 Not Implemented
UU0050 # 08 Y:2003 08 2003 OPTIMIZE PLANT POWER FACTOR $5,144 $9,200 Not Implemented
UU0009 # 01 Y:2001 01 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,515 $19,380 Implemented
UU0009 # 05 Y:2001 05 2001 USE SYNTHETIC LUBRICANT $1,276 $600 Implemented