Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,491
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0723 # 04 Y:2014 | 04 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $11,047 | $32,000 | Not Implemented |
MA0723 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,158 | $1,250 | Implemented |
MA0721 # 01 Y:2013 | 01 | 2013 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $15,477 | $1,400 | Not Implemented |
MA0721 # 02 Y:2013 | 02 | 2013 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,906 | $7,500 | Implemented |
MA0721 # 03 Y:2013 | 03 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,493 | $11,000 | Implemented |
MA0721 # 04 Y:2013 | 04 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,864 | $200 | Implemented |
MA0721 # 05 Y:2013 | 05 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,474 | $200 | Implemented |
MA0721 # 06 Y:2013 | 06 | 2013 | REPAIR AND ELIMINATE STEAM LEAKS | $2,358 | $1,120 | Implemented |
MA0721 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,130 | $1,020 | Implemented |
MA0721 # 08 Y:2013 | 08 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,106 | $6,390 | Not Implemented |
MA0721 # 09 Y:2013 | 09 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,465 | $1,650 | Not Implemented |
OR0620 # 01 Y:2013 | 01 | 2013 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $50,574 | $68,750 | Not Implemented |
OR0620 # 02 Y:2013 | 02 | 2013 | REDUCE VENTILATION AIR | $28,525 | $3,200 | Not Implemented |
OR0620 # 03 Y:2013 | 03 | 2013 | INSULATE BARE EQUIPMENT | $456 | $163 | Not Implemented |
OR0620 # 04 Y:2013 | 04 | 2013 | MODIFY STARTUP/SHUTDOWN TIMES | $442 | $481 | Not Implemented |
OR0620 # 05 Y:2013 | 05 | 2013 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $584 | $2,554 | Not Implemented |
OR0619 # 01 Y:2013 | 01 | 2013 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $7,073 | $2,342 | Not Implemented |
OR0619 # 02 Y:2013 | 02 | 2013 | REDUCE FLUID FLOW RATES | $2,879 | $6,200 | Not Implemented |
OR0619 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,300 | $50,000 | Not Implemented |
OR0619 # 04 Y:2013 | 04 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $679 | $1,677 | Not Implemented |
OR0619 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,667 | $2,342 | Not Implemented |
OR0619 # 06 Y:2013 | 06 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,550 | $13,225 | Not Implemented |
BS0022 # 01 Y:2013 | 01 | 2013 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $3,444 | $500 | Implemented |
BS0022 # 02 Y:2013 | 02 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,989 | $218 | Implemented |
BS0022 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,022 | $26,934 | Not Implemented |