Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,491
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0416 # 04 Y:2006 | 04 | 2006 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $1,237 | $0 | Not Implemented |
AS0416 # 05 Y:2006 | 05 | 2006 | USE SOLAR HEAT TO HEAT WATER | $345 | $2,050 | Not Implemented |
UD0734 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,890 | $19,500 | Implemented |
UD0734 # 02 Y:2006 | 02 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $5,301 | $0 | Not Implemented |
UD0734 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,023 | $1,900 | Implemented |
UD0734 # 04 Y:2006 | 04 | 2006 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $2,800 | $0 | Implemented |
UD0734 # 05 Y:2006 | 05 | 2006 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,510 | $0 | Implemented |
UD0734 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM THICKNESS INSULATION | $2,141 | $3,500 | Not Implemented |
UD0734 # 07 Y:2006 | 07 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,798 | $8,041 | Implemented |
UD0734 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $935 | $0 | Not Implemented |
UD0734 # 09 Y:2006 | 09 | 2006 | REDUCE VENTILATION AIR | $750 | $0 | Implemented |
UD0734 # 10 Y:2006 | 10 | 2006 | USE PHOTOCELL CONTROLS | $477 | $275 | Implemented |
UD0734 # 11 Y:2006 | 11 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $465 | $53 | Implemented |
UF0371 # 01 Y:2005 | 01 | 2005 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $6,120 | $978 | Implemented |
UF0371 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,368 | $650 | Implemented |
UF0371 # 03 Y:2005 | 03 | 2005 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $6,271 | $1,680 | Implemented |
UF0371 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,453 | $675 | Implemented |
UF0371 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $2,952 | $4,688 | Not Implemented |
UF0371 # 06 Y:2005 | 06 | 2005 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,254 | $20,000 | Not Implemented |
UF0371 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $18,424 | $0 | Implemented |
UF0371 # 08 Y:2005 | 08 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,385 | $0 | Implemented |
UF0371 # 09 Y:2005 | 09 | 2005 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $5,477 | $800 | Implemented |
UF0371 # 10 Y:2005 | 10 | 2005 | REDESIGN PROCESS | $61,200 | $1,000,000 | Not Implemented |
UF0371 # 11 Y:2005 | 11 | 2005 | IMPROVE SPACE COMFORT CONDITIONING | $1,596 | $26,800 | Implemented |
UF0371 # 12 Y:2005 | 12 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $100,000 | $25,000 | Implemented |