IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,491

matching recommendations
Reset
SIC 372 Aircraft And Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0416 # 04 Y:2006 04 2006 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,237 $0 Not Implemented
AS0416 # 05 Y:2006 05 2006 USE SOLAR HEAT TO HEAT WATER $345 $2,050 Not Implemented
UD0734 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,890 $19,500 Implemented
UD0734 # 02 Y:2006 02 2006 UPGRADE CONTROLS ON COMPRESSORS $5,301 $0 Not Implemented
UD0734 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,023 $1,900 Implemented
UD0734 # 04 Y:2006 04 2006 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $2,800 $0 Implemented
UD0734 # 05 Y:2006 05 2006 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,510 $0 Implemented
UD0734 # 06 Y:2006 06 2006 USE OPTIMUM THICKNESS INSULATION $2,141 $3,500 Not Implemented
UD0734 # 07 Y:2006 07 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,798 $8,041 Implemented
UD0734 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $935 $0 Not Implemented
UD0734 # 09 Y:2006 09 2006 REDUCE VENTILATION AIR $750 $0 Implemented
UD0734 # 10 Y:2006 10 2006 USE PHOTOCELL CONTROLS $477 $275 Implemented
UD0734 # 11 Y:2006 11 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $465 $53 Implemented
UF0371 # 01 Y:2005 01 2005 LOWER CEILING TO REDUCE CONDITIONED SPACE $6,120 $978 Implemented
UF0371 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,368 $650 Implemented
UF0371 # 03 Y:2005 03 2005 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $6,271 $1,680 Implemented
UF0371 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,453 $675 Implemented
UF0371 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $2,952 $4,688 Not Implemented
UF0371 # 06 Y:2005 06 2005 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,254 $20,000 Not Implemented
UF0371 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18,424 $0 Implemented
UF0371 # 08 Y:2005 08 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,385 $0 Implemented
UF0371 # 09 Y:2005 09 2005 LOWER CEILING TO REDUCE CONDITIONED SPACE $5,477 $800 Implemented
UF0371 # 10 Y:2005 10 2005 REDESIGN PROCESS $61,200 $1,000,000 Not Implemented
UF0371 # 11 Y:2005 11 2005 IMPROVE SPACE COMFORT CONDITIONING $1,596 $26,800 Implemented
UF0371 # 12 Y:2005 12 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $100,000 $25,000 Implemented