IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,485

matching recommendations
Reset
SIC 372 Aircraft And Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0107 # 07 Y:1995 07 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,816 $42,705 Not Implemented
UF0107 # 08 Y:1995 08 1995 REPLACE ELECTRIC REHEAT WITH HEAT PIPES $18,904 $31,500 Not Implemented
UF0107 # 09 Y:1995 09 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,373 $9,000 Not Implemented
UF0107 # 10 Y:1995 10 1995 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $2,754 $4,450 Implemented
UF0107 # 11 Y:1995 11 1995 USE MECHANICAL STRIPPING METHODS $4,715 $82 Not Implemented
UF0107 # 12 Y:1995 12 1995 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $3,815 $2,500 Not Implemented
UF0110 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,227 $646 Implemented
UF0110 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,047 $4,477 Not Implemented
UF0110 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230 $400 Implemented
UF0110 # 04 Y:1995 04 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $25,754 $0 Not Implemented
UF0110 # 05 Y:1995 05 1995 REPLACE ELECTRIC REHEAT WITH HEAT PIPES $19,763 $21,000 Not Implemented
UF0110 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $95 $284 Not Implemented
AR0034 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,968 $3,070 Implemented
AR0034 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,299 $542 Implemented
AR0034 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,404 $780 Implemented
AR0034 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $123 $100 Implemented
AR0034 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,192 $250 Implemented
AR0034 # 06 Y:1995 06 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,761 $0 Implemented
AR0045 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,479 $531 Implemented
AR0045 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,375 $310 Implemented
AR0045 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,249 $200 Implemented
AR0045 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,176 $3,090 Implemented
AR0045 # 05 Y:1994 05 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,513 $0 Implemented
CO0297 # 01 Y:1994 01 1994 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $21,300 $16,000 Not Implemented
CO0297 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,150 $34,110 Not Implemented