Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
210
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0559 # 06 Y:2023 | 06 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,205 | $248 | Not Implemented |
AS0559 # 08 Y:2023 | 08 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $263 | $660 | Not Implemented |
AS0559 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,376 | $6,232 | Not Implemented |
AS0559 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,469 | $166 | Not Implemented |
AS0559 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,967 | $325 | Not Implemented |
AS0559 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $320 | $235 | Not Implemented |
AS0559 # 04 Y:2023 | 04 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $4,898 | $1,744 | Not Implemented |
AS0559 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $19,170 | $219,972 | Not Implemented |
AS0517 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,690 | $126,497 | Not Implemented |
AS0517 # 02 Y:2022 | 02 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $11,446 | $48,382 | Not Implemented |
AS0517 # 04 Y:2022 | 04 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,331 | $39,600 | Implemented |
AS0517 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,189 | $859 | Implemented |
AS0517 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,256 | $1,541 | Implemented |
AS0517 # 05 Y:2022 | 05 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,692 | $2,880 | Not Implemented |
AS0517 # 03 Y:2022 | 03 | 2022 | USE OPTIMUM THICKNESS INSULATION | $10,522 | $15,516 | Implemented |
AS0474 # 07 Y:2019 | 07 | 2019 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $838 | $687 | Not Implemented |
AS0474 # 01 Y:2019 | 01 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $20,118 | $5,404 | Implemented |
AS0474 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,935 | $516 | Implemented |
AS0474 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $77 | $0 | Implemented |
AS0474 # 02 Y:2019 | 02 | 2019 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $9,875 | $2,238 | Implemented |
AS0474 # 06 Y:2019 | 06 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,267 | $110 | Not Implemented |
AS0474 # 04 Y:2019 | 04 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,818 | $895 | Implemented |
AS0474 # 03 Y:2019 | 03 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $7,733 | $750 | Implemented |
AS0416 # 03 Y:2006 | 03 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,096 | $0 | Implemented |
AS0416 # 01 Y:2006 | 01 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $31,751 | $36,000 | Not Implemented |