IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 372 Aircraft And Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0154 # 07 Y:2021 07 2021 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $893 $710 Not Implemented
BS0154 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $679 $280 Not Implemented
BS0154 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,750 $3,231 Not Implemented
BS0154 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,232 $320 Not Implemented
BS0154 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $766 $25 Not Implemented
BS0154 # 05 Y:2021 05 2021 ADOPT IN-HOUSE MATERIAL GENERATION $182,277 $204,462 Not Implemented
BS0154 # 06 Y:2021 06 2021 RECOVER WASTE HEAT FROM EQUIPMENT $8,288 $6,000 Not Implemented
BS0041 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,789 $8,520 Not Implemented
BS0041 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $1,000 $180 Not Implemented
BS0041 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $988 $5,580 Not Implemented
BS0041 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $156 $480 Not Implemented
BS0041 # 05 Y:2014 05 2014 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,010 $3,900 Not Implemented
BS0041 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,476 $15 Not Implemented
BS0041 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $398 $722 Not Implemented
BS0041 # 08 Y:2014 08 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $930 $285 Not Implemented
BS0041 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $118 $292 Not Implemented
BS0041 # 10 Y:2014 10 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,324 $15,600 Not Implemented
BS0041 # 11 Y:2014 11 2014 INSULATE BARE EQUIPMENT $436 $1,128 Not Implemented
BS0022 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,989 $218 Implemented
BS0022 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $871 $15 Implemented
BS0022 # 05 Y:2013 05 2013 REPAIR AND ELIMINATE STEAM LEAKS $1,748 $697 Implemented
BS0022 # 04 Y:2013 04 2013 COVER OPEN TANKS $418 $310 Not Implemented
BS0022 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,022 $26,934 Not Implemented
BS0022 # 01 Y:2013 01 2013 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $3,444 $500 Implemented
OR0466 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,000 $21,000 Implemented