IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
SIC 372 Aircraft And Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0261 # 02 Y:2024 02 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,592 $37,200 n/a
UU0261 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $400 $5,940 n/a
UU0261 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,063 $9,140 n/a
UU0261 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,386 $8,280 n/a
UU0261 # 03 Y:2024 03 2024 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $12,100 $21,600 n/a
UU0261 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $22,296 $572,100 n/a
UU0194 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,610 $23,208 Implemented
UU0194 # 05 Y:2022 05 2022 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $1,788 $2,208 Not Implemented
UU0194 # 01 Y:2022 01 2022 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $39,902 $83,130 Not Implemented
UU0194 # 06 Y:2022 06 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $896 $1,796 Implemented
UU0194 # 03 Y:2022 03 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $25,369 $20,108 Not Implemented
UU0194 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,721 $113,682 Implemented
UU0192 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,269 $1,000 Not Implemented
UU0192 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,064 $4,892 Implemented
UU0192 # 08 Y:2022 08 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $464 $100 Not Implemented
UU0192 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,994 $15,475 Implemented
UU0192 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $3,945 $5,606 Implemented
UU0192 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,219 $52,219 Implemented
UU0192 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,872 $40,613 Implemented
UU0192 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $2,978 $3,520 Implemented
UU0142 # 01 Y:2019 01 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,657 $600 Not Implemented
UU0142 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,661 $0 Implemented
UU0142 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $810 $129 Not Implemented
UU0142 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,981 $14,585 Implemented
UU0142 # 07 Y:2019 07 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $288 $100 Implemented