IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

80

matching recommendations
Reset
SIC 372 Aircraft And Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0167 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,037 $3,300 Implemented
SD0167 # 08 Y:1997 08 1997 BURN A LESS EXPENSIVE GRADE OF FUEL $12,852 $0 Not Implemented
SD0167 # 09 Y:1997 09 1997 MODIFY CURRENT INCENTIVE PROGRAM $6,790 $0 Not Implemented
SD0167 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,700 $250 Implemented
SD0167 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,304 $0 Implemented
SD0167 # 06 Y:1997 06 1997 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $51,824 $0 Not Implemented
SD0167 # 07 Y:1997 07 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,601 $24,427 Implemented
SD0167 # 05 Y:1997 05 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $840 $0 Implemented
SD0167 # 03 Y:1997 03 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,973 $6,500 Implemented
SD0185 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $820 $1,500 Not Implemented
SD0185 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $710 $2,025 Implemented
SD0185 # 08 Y:1997 08 1997 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS $53,325 $0 Implemented
SD0185 # 03 Y:1997 03 1997 INSTALL TIMERS AND/OR THERMOSTATS $1,591 $1,830 Not Implemented
SD0185 # 02 Y:1997 02 1997 USE OPTIMUM THICKNESS INSULATION $4,451 $3,200 Not Implemented
SD0185 # 01 Y:1997 01 1997 USE OPTIMUM THICKNESS INSULATION $11,371 $2,170 Not Implemented
SD0185 # 06 Y:1997 06 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $806 $1,030 Implemented
SD0185 # 09 Y:1997 09 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,900 $8,500 Not Implemented
SD0185 # 07 Y:1997 07 1997 USE ULTRASONIC CLEANING $53,556 $1,140 Implemented
SD0183 # 10 Y:1997 10 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,640 $2,000 Not Implemented
SD0183 # 11 Y:1997 11 1997 TREAT AND REUSE RINSE WATERS $185 $100 Implemented
SD0183 # 04 Y:1997 04 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $915 $650 Implemented
SD0183 # 07 Y:1997 07 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $7,155 $9,085 Implemented
SD0183 # 01 Y:1997 01 1997 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $14,050 $4,000 Not Implemented
SD0183 # 02 Y:1997 02 1997 USE OPTIMUM THICKNESS INSULATION $6,107 $570 Implemented
SD0183 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,385 $11,002 Implemented