IAC logo
IAC Assessment: SD0167
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0167
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1997
Principal Product Aircraft Fuel Systems
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 163,000
Annual Production 1,000 Pieces
Production Hrs. Annual 2,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,093 2,272,861 kWh $0.07
Electricity Demand $115,816 11,652 kW-months/year $9.94
Natural Gas $10,624 1,919 MMBtu $5.54
TOTAL ENERGY COSTS $275,533
RECOMMENDED SAVINGS* $97,921 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,455
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,037
Cost:
$3,300
$1,684 25,498 $1,353 136 - - $1,684
25,498
kWh
$1,353
136
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,700
Cost:
$250
$2,052 31,067 $1,648 166 - - $2,052
31,067
kWh
$1,648
166
kW-months/year
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,973
Cost:
$6,500
$1,319 19,930 $2,654 267 - - $1,319
19,930
kWh
$2,654
267
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,304
Cost:
-
$723 10,844 $581 58 - - $723
10,844
kWh
$581
58
kW-months/year
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$840
Cost:
-
$393 5,862 $447 45 - - $393
5,862
kWh
$447
45
kW-months/year
-
-
$
06: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$51,824
Cost:
-
- - $51,824 1,118 - - -
-
kWh
$51,824
1,118
kW-months/year
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,601
Cost:
$24,427
$7,848 118,699 $5,753 579 - - $7,848
118,699
kWh
$5,753
579
kW-months/year
-
-
$
08: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$12,852
Cost:
-
- - - - $12,852 - -
-
kWh
-
-
kW-months/year
$12,852
-
$
09: 4.421 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$6,790
Cost:
-
- - - - $6,790 - -
-
kWh
-
-
kW-months/year
$6,790
-
$
TOTAL RECOMMENDED Savings:
$97,921
Cost:
$34,477
$14,019 211,900 $64,260 2,369 $19,642 - $14,019
211,900
kWh
$64,260
2,369
kW-months/year
$19,642
-
$
TOTAL IMPLEMENTED Savings:
$26,455
Cost:
$34,477
$14,019 211,900 $12,436 1,251 - - $14,019
211,900
kWh
$12,436
1,251
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes