Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,224
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0398 # 05 Y:2007 | 05 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,353 | $2,193 | Not Implemented |
SD0398 # 04 Y:2007 | 04 | 2007 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,860 | $5,101 | Not Implemented |
SD0398 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,030 | $45,224 | Implemented |
SD0398 # 02 Y:2007 | 02 | 2007 | INSTALL SKYLIGHTS | $4,253 | $13,615 | Not Implemented |
SD0398 # 03 Y:2007 | 03 | 2007 | REPAIR AND ELIMINATE STEAM LEAKS | $2,091 | $150 | Implemented |
CO0606 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,880 | $620 | Implemented |
CO0606 # 03 Y:2007 | 03 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,150 | $2,680 | Implemented |
CO0606 # 04 Y:2007 | 04 | 2007 | USE EVAPORATION TO CONCENTRATE MATERIAL | $1,060 | $3,000 | Not Implemented |
CO0606 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,790 | $10,000 | Implemented |
CO0606 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,080 | $13,670 | Implemented |
CO0606 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,630 | $69,110 | Implemented |
CO0606 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,100 | $60 | Implemented |
CO0606 # 08 Y:2007 | 08 | 2007 | INSTALL OCCUPANCY SENSORS | $1,890 | $9,180 | Implemented |
UW0003 # 01 Y:2007 | 01 | 2007 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,385 | $50,000 | Not Implemented |
UW0003 # 03 Y:2007 | 03 | 2007 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $5,723 | $20,750 | Not Implemented |
UW0003 # 05 Y:2007 | 05 | 2007 | INSTALL OCCUPANCY SENSORS | $905 | $1,200 | Implemented |
UW0003 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $929 | $2,100 | Implemented |
UW0003 # 04 Y:2007 | 04 | 2007 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,551 | $7,020 | Implemented |
MI0154 # 06 Y:2007 | 06 | 2007 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,146 | $300 | Implemented |
MI0154 # 03 Y:2007 | 03 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $30,511 | $120 | Implemented |
MI0154 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,092 | $1,074 | Implemented |
MI0154 # 05 Y:2007 | 05 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,388 | $1,250 | Not Implemented |
MI0154 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,215 | $73,710 | Implemented |
MI0154 # 01 Y:2007 | 01 | 2007 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $99,787 | $131,000 | Not Implemented |
MI0154 # 08 Y:2007 | 08 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,043 | $30 | Implemented |