Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0028 # 08 Y:2008 | 08 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,006 | $0 | Not Implemented |
UA0028 # 07 Y:2008 | 07 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,651 | $1,500 | Not Implemented |
UA0028 # 06 Y:2008 | 06 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,591 | $34,365 | Not Implemented |
UA0028 # 05 Y:2008 | 05 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,703 | $475 | Not Implemented |
UA0028 # 04 Y:2008 | 04 | 2008 | USE PHOTOCELL CONTROLS | $131 | $111 | Implemented |
UA0028 # 03 Y:2008 | 03 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,267 | $0 | Implemented |
UA0028 # 02 Y:2008 | 02 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,601 | $17,000 | Not Implemented |
UA0028 # 01 Y:2008 | 01 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,177 | $900 | Not Implemented |
SU0268 # 07 Y:2008 | 07 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $781 | $1,451 | Not Implemented |
SU0268 # 09 Y:2008 | 09 | 2008 | OPTIMIZE PLANT POWER FACTOR | $11,006 | $39,533 | Not Implemented |
SU0268 # 08 Y:2008 | 08 | 2008 | INSTALL OCCUPANCY SENSORS | $318 | $674 | Implemented |
SU0268 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,769 | $83,044 | Implemented |
SU0268 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $310 | $385 | Implemented |
SU0268 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,511 | $1,250 | Implemented |
SU0268 # 03 Y:2008 | 03 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $22,823 | $1,071 | Implemented |
SU0268 # 02 Y:2008 | 02 | 2008 | PAY BILLS ON TIME TO AVOID LATE FEES | $854 | $0 | Not Implemented |
SU0268 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,465 | $0 | Not Implemented |
WV0372 # 04 Y:2008 | 04 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,107 | $540 | Not Implemented |
WV0372 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,998 | $34,945 | Not Implemented |
WV0372 # 02 Y:2008 | 02 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $13,813 | $2,000 | Implemented |
WV0372 # 03 Y:2008 | 03 | 2008 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,188 | $511 | Implemented |
WV0372 # 07 Y:2008 | 07 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $3,550 | $890 | Implemented |
WV0372 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,593 | $8,011 | Implemented |
WV0372 # 06 Y:2008 | 06 | 2008 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $5,074 | $4,500 | Implemented |
WV0372 # 08 Y:2008 | 08 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,560 | $2,750 | Not Implemented |