Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
230
matching recommendationsSIC | 3721 | Aircraft |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0644 # 05 Y:2010 | 05 | 2010 | USE SOLAR HEAT TO MAKE ELECTRICTY | $2,500 | $27,500 | Not Implemented |
CO0644 # 06 Y:2010 | 06 | 2010 | REDUCE VENTILATION AIR | $1,390 | $12,400 | Implemented |
MI0196 # 01 Y:2010 | 01 | 2010 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $157,910 | $102,500 | Implemented |
MI0196 # 02 Y:2010 | 02 | 2010 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $113,486 | $143,892 | Not Implemented |
MI0196 # 03 Y:2010 | 03 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $108,082 | $2,000 | Implemented |
MI0196 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $34,243 | $1,210 | Implemented |
MI0196 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,467 | $40 | Not Implemented |
MI0196 # 06 Y:2010 | 06 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,786 | $4,531 | Not Implemented |
UF0435 # 01 Y:2010 | 01 | 2010 | INSTALL OCCUPANCY SENSORS | $60,031 | $5,388 | Not Implemented |
UF0435 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,247 | $18,650 | Implemented |
UF0435 # 03 Y:2010 | 03 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,927 | $9,651 | Implemented |
UF0435 # 04 Y:2010 | 04 | 2010 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $634 | $20 | Implemented |
UF0435 # 05 Y:2010 | 05 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,752 | $772 | Not Implemented |
UF0402 # 01 Y:2007 | 01 | 2007 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $29,529 | $1,827 | Not Implemented |
UF0402 # 02 Y:2007 | 02 | 2007 | USE OPTIMUM THICKNESS INSULATION | $640 | $2,320 | Not Implemented |
UF0402 # 03 Y:2007 | 03 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $335 | $177 | Implemented |
UF0402 # 04 Y:2007 | 04 | 2007 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,214 | $0 | Implemented |
UF0402 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64,361 | $80,399 | Not Implemented |
UF0402 # 06 Y:2007 | 06 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $13,315 | $57,868 | Not Implemented |
UF0402 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $3,641 | $194 | Implemented |
UF0402 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,006 | $1,413 | Not Implemented |
UF0402 # 09 Y:2007 | 09 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $38,931 | $2,136 | Not Implemented |
UF0402 # 10 Y:2007 | 10 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,194 | $390 | Implemented |
UF0402 # 11 Y:2007 | 11 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,118 | $1,373 | Not Implemented |
UF0402 # 12 Y:2007 | 12 | 2007 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $2,259 | $8,400 | Not Implemented |