IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

230

matching recommendations
Reset
SIC 3721 Aircraft
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0644 # 05 Y:2010 05 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $2,500 $27,500 Not Implemented
CO0644 # 06 Y:2010 06 2010 REDUCE VENTILATION AIR $1,390 $12,400 Implemented
MI0196 # 01 Y:2010 01 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $157,910 $102,500 Implemented
MI0196 # 02 Y:2010 02 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $113,486 $143,892 Not Implemented
MI0196 # 03 Y:2010 03 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $108,082 $2,000 Implemented
MI0196 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,243 $1,210 Implemented
MI0196 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,467 $40 Not Implemented
MI0196 # 06 Y:2010 06 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,786 $4,531 Not Implemented
UF0435 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $60,031 $5,388 Not Implemented
UF0435 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,247 $18,650 Implemented
UF0435 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,927 $9,651 Implemented
UF0435 # 04 Y:2010 04 2010 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $634 $20 Implemented
UF0435 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,752 $772 Not Implemented
UF0402 # 01 Y:2007 01 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $29,529 $1,827 Not Implemented
UF0402 # 02 Y:2007 02 2007 USE OPTIMUM THICKNESS INSULATION $640 $2,320 Not Implemented
UF0402 # 03 Y:2007 03 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $335 $177 Implemented
UF0402 # 04 Y:2007 04 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,214 $0 Implemented
UF0402 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,361 $80,399 Not Implemented
UF0402 # 06 Y:2007 06 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,315 $57,868 Not Implemented
UF0402 # 07 Y:2007 07 2007 INSTALL OCCUPANCY SENSORS $3,641 $194 Implemented
UF0402 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,006 $1,413 Not Implemented
UF0402 # 09 Y:2007 09 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $38,931 $2,136 Not Implemented
UF0402 # 10 Y:2007 10 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,194 $390 Implemented
UF0402 # 11 Y:2007 11 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,118 $1,373 Not Implemented
UF0402 # 12 Y:2007 12 2007 LOWER CEILING TO REDUCE CONDITIONED SPACE $2,259 $8,400 Not Implemented