IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

588

matching recommendations
Reset
SIC 3724 Aircraft Engines And Engine Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0379 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $198 $350 n/a
BD0379 # 07 Y:2010 07 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,893 $300 Not Implemented
BD0379 # 08 Y:2010 08 2010 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $2,879 $1,680 n/a
SU0294 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,067 $0 Implemented
SU0294 # 02 Y:2010 02 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,276 $0 Implemented
SU0294 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,995 $1,245 Not Implemented
SU0294 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,763 $1,440 Implemented
SU0294 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $267 $492 Implemented
SU0294 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $142 $817 Implemented
SU0294 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $1,808 $9,734 Not Implemented
SU0294 # 08 Y:2010 08 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,680 $17,732 Not Implemented
SU0294 # 09 Y:2010 09 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $108 $516 Not Implemented
SU0294 # 10 Y:2010 10 2010 UPGRADE OBSOLETE EQUIPMENT $276 $1,831 Implemented
GT0863 # 01 Y:2009 01 2009 REPAIR AND ELIMINATE STEAM LEAKS $3,847 $500 Not Implemented
GT0863 # 02 Y:2009 02 2009 $24,150 $0 Not Implemented
GT0863 # 03 Y:2009 03 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $194,835 $180,000 Not Implemented
GT0863 # 04 Y:2009 04 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $316,142 $180,000 Not Implemented
GT0863 # 05 Y:2009 05 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $107,962 $125,000 Not Implemented
CO0619 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $37,130 $140,000 Implemented
CO0619 # 02 Y:2009 02 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $270 $580 Implemented
CO0619 # 03 Y:2009 03 2009 USE PHOTOCELL CONTROLS $1,710 $20,000 Implemented
CO0619 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $790 $2,150 Not Implemented
CO0619 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $400 Implemented
SU0268 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,465 $0 Not Implemented
SU0268 # 02 Y:2008 02 2008 $854 $0 Not Implemented