IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
SIC 3724 Aircraft Engines And Engine Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0412 # 07 Y:2005 07 2005 USE SOLAR HEAT TO HEAT WATER $345 $2,800 Implemented
AS0412 # 06 Y:2005 06 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $762 $25 Implemented
AS0412 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,173 $10,610 Implemented
AS0412 # 04 Y:2005 04 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $15,470 $14,400 Implemented
AS0412 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,601 $2,000 Implemented
AS0412 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $37,178 $15,000 Implemented
AS0412 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $37,489 $5,000 Implemented
AS0255 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,779 $120 Not Implemented
AS0255 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,341 $20,474 Not Implemented
AS0255 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $358 $442 Not Implemented
AS0255 # 03 Y:1999 03 1999 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,365 $195 Not Implemented
AS0255 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,392 $120 Not Implemented
AS0255 # 05 Y:1999 05 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,137 $14,500 Not Implemented
AS0255 # 07 Y:1999 07 1999 PAY BILLS ON TIME TO AVOID LATE FEES $3,261 $60 Not Implemented
AS0255 # 08 Y:1999 08 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $12,000 $1,500 Implemented
AS0160 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,535 $18,701 Not Implemented
AS0160 # 10 Y:1995 10 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,773 $54,725 Not Implemented
AS0160 # 09 Y:1995 09 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,722 $1,360 Not Implemented
AS0160 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $389 $600 Not Implemented
AS0160 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $432 $656 Not Implemented
AS0160 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,309 $1,200 Not Implemented
AS0160 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $3,078 $1,000 Not Implemented
AS0160 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $618 $1,210 Not Implemented
AS0160 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,251 $0 Not Implemented
AS0160 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,480 $12,523 Not Implemented